My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002522
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT
>
308
>
2900 - Site Mitigation Program
>
PR0542014
>
ARCHIVED REPORTS_XR0002522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 6:06:49 PM
Creation date
1/16/2020 4:23:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002522
RECORD_ID
PR0542014
PE
2960
FACILITY_ID
FA0023306
FACILITY_NAME
LARRYS AUTO REPAIR
STREET_NUMBER
308
Direction
N
STREET_NAME
GRANT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
308 N GRANT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 20 November 1995 <br /> AGE-NC Protect No 95-0184 <br /> Page 2 of 5 <br /> Five soil bonngs (B 1 through B5) were drilled at the site by Geological Audit Services, Inc from <br /> February 11 to 14, 1994 Borings B 1 through B4 were completed as groundwater monitoring wells' <br /> MW-1 through MW-4, respectively Free product was encountered in MW4 and removed TPH as <br /> gasoline and BTE&X were detected in each well, TPH as diesel was detected in MW4 <br /> 3.0. SCOPE OF WORK <br /> 3 1 DRILLING AND SAMPLING <br /> Additional investigation is required to determine the lateral and vertical extent and hydrocarbon <br /> impacted soil and ground water at the site Feasibility testing should also be performed to determine <br /> remedial options for the site <br /> AGE proposes to drill six soil borings at and near 308 North Grant Street Five borings will be dulled <br /> using a truck-mounted, hollow-stem drill ng One boring, inside a building, will be advanced using <br /> a Geoprobe One boring will be completed as ground water monitoring well MW-5 Two borings will <br /> be cluster-completed as vadose zone wells (vapor extraction wells) <br /> 3 2 EQUIPMENT DECONTAMINATION <br /> All sampling tools and brass sleeves used for sample collection will be thoroughly rinsed with clean <br /> water after washing with a solution of Alconox All hollow stem augers are steam-cleaned prior to <br /> advancement in each borehole <br /> 3 3 LABORATORY ANALYSIS <br /> Selected soil and ground water samples will be analyzed for total petroleum hydrocarbons quantified <br /> as gasoline and diesel (TPH-g and TPH-d) and volatile aromatics(benzene, toluene, ethylbenzene, <br /> and xylenes BTE&X) in accordance with EPA methods 8015/5030 and 8020/602, respectively <br /> Additionally, several samples will undergo physicochemical and microbiological analysis to determine <br /> bioremediation feasibility <br /> Laboratory reports of both soil and ground water analyses, testing methods, laboratory quality <br /> assurance/quality control (QA/QC) reports, and sample chain-of-custody documentation will be <br /> presented in a report with the findings and recommendations <br />
The URL can be used to link to this page
Your browser does not support the video tag.