Laserfiche WebLink
s k KLEINFELDER <br /> ` The <br /> environmental concerns indicated in this assessment are limited to eldsung accessible <br /> available information obtained from regulatory agency files and information, at the time of <br /> this assessment. <br /> Kleinfeider suggests that Maria III Engineering Contractors continue to monitor the <br /> regulatory agency investigations at the .PG & E, Mobil Oil Bulk Plant, and former <br /> Handyn=n facilities to note findings regarding potential ground water contamination that <br /> may impact the subject site. <br /> The development of property for residential, hospital, school, or other related uses located <br /> within 2,000 feet of a significant release of hazardous waste or disposal area requires a <br /> determination of the applicability of the DHS Hazardous Waste Site Border Zone Property <br /> Law, California Health and Safety Code, Article 11, Sections 25220-2.5241. Commercial, <br /> industrial, and agricultural developments are usually not affected by these requirements. if <br /> future development plans change to include residential, schools or hospitals, then a <br /> hazardous waste site border zone property determination by the DHS may be required. <br /> i <br /> 1 <br /> 137-88-1690 3 <br />