My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
17750
>
2900 - Site Mitigation Program
>
PR0501477
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:22 AM
Creation date
1/24/2020 2:15:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0501477
PE
2965
FACILITY_ID
FA0005116
FACILITY_NAME
SMS BRINERS INC
STREET_NUMBER
17750
Direction
E
STREET_NAME
STATE ROUTE 4
City
STOCKTON
Zip
95206
APN
18314010
CURRENT_STATUS
01
SITE_LOCATION
17750 E HWY 4
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Chelli <br /> December 1,2005 <br /> Page 2 of 2 <br /> 10 gpm after 20 minutes. It was noted that water levels in the well declined rapidly when pumping at <br /> rates in excess of about 10.5 gpm, causing the pump to break suction. <br /> The top elevation of the new well casing will be surveyed in the near future. <br /> A four-day aquifer test was concluded in late November and results will be presented under separate <br /> cover by December 20,2005. This report will include baseline water quality results from the new <br /> well and an updated extent of the salt-affected area. Field measurements collected from EW I during <br /> the aquifer test indicated stable electrical conductivities(EC)below the upper tolerance bound for <br /> background EC(985 µS/cm)in the shallow zone. A report supplementing the report Groundwater <br /> Corrective Action Measures, SMS Briners(LSCE,March 2005)will be prepared to describe <br /> recommended corrective action measures. This report will be submitted by February 10, 2006, <br /> immediately following the submittal of the forthcoming 2005 Annual Report. <br /> Please call if you have any comments or questions regarding this well installation report. <br /> Sincerely, <br /> LUHDORFF AND SCALMANINI <br /> CONSULTING ENGINEERS <br /> Vicki Kretsinger <br /> Principal Hydrologist <br /> L GFp <br /> /� /1 4p��(i�Q`�G AfuQF9 fQ, <br /> �/ <br /> Till Ange/� P.G. 0 , Z a <br /> Project Hy geologist * No. 7789 <br /> to <br /> TEA/vk <br /> Enclosures <br /> Attachment 1 - San Joaquin County Well Permit <br /> Attachment 2 - Current Monitoring Network <br /> Attachment 3 - EW l:As-Built Well Profile <br /> Cc: Victor Izzo,Central Valley Regional Water Quality Control Board <br /> Howard Hold,Central Valley Regional Water Quality Control Board <br /> Erik Kruger,Kruger Foods,Inc. <br /> Mike Infuma, San Joaquin County Environmental Health Department <br /> © LUHIIORF` 6 :1X.01 VIANIN' <br />
The URL can be used to link to this page
Your browser does not support the video tag.