Laserfiche WebLink
Mr. Chelli <br /> December 1,2005 <br /> Page 2 of 2 <br /> 10 gpm after 20 minutes. It was noted that water levels in the well declined rapidly when pumping at <br /> rates in excess of about 10.5 gpm, causing the pump to break suction. <br /> The top elevation of the new well casing will be surveyed in the near future. <br /> A four-day aquifer test was concluded in late November and results will be presented under separate <br /> cover by December 20,2005. This report will include baseline water quality results from the new <br /> well and an updated extent of the salt-affected area. Field measurements collected from EW I during <br /> the aquifer test indicated stable electrical conductivities(EC)below the upper tolerance bound for <br /> background EC(985 µS/cm)in the shallow zone. A report supplementing the report Groundwater <br /> Corrective Action Measures, SMS Briners(LSCE,March 2005)will be prepared to describe <br /> recommended corrective action measures. This report will be submitted by February 10, 2006, <br /> immediately following the submittal of the forthcoming 2005 Annual Report. <br /> Please call if you have any comments or questions regarding this well installation report. <br /> Sincerely, <br /> LUHDORFF AND SCALMANINI <br /> CONSULTING ENGINEERS <br /> Vicki Kretsinger <br /> Principal Hydrologist <br /> L GFp <br /> /� /1 4p��(i�Q`�G AfuQF9 fQ, <br /> �/ <br /> Till Ange/� P.G. 0 , Z a <br /> Project Hy geologist * No. 7789 <br /> to <br /> TEA/vk <br /> Enclosures <br /> Attachment 1 - San Joaquin County Well Permit <br /> Attachment 2 - Current Monitoring Network <br /> Attachment 3 - EW l:As-Built Well Profile <br /> Cc: Victor Izzo,Central Valley Regional Water Quality Control Board <br /> Howard Hold,Central Valley Regional Water Quality Control Board <br /> Erik Kruger,Kruger Foods,Inc. <br /> Mike Infuma, San Joaquin County Environmental Health Department <br /> © LUHIIORF` 6 :1X.01 VIANIN' <br />