Laserfiche WebLink
� A <br /> one of the soil samples submitted for analysis from each deep boring will be from below the <br /> bottom of the former gasoline USTs. <br /> The three deep borings will be completed as groundwater monitoring wells. The monitoring wells <br /> will be constructed of 2-inch inside diameter PVC well screen and casing. A 0.010-inch well <br /> screen slot and 92/12 mesh sand pack will be used. The wells will be completed in accordance <br /> with the original workplan. <br /> Accordingly, groundwater samples collected from the monitoring wells will be analyzed for <br /> TPHg, TPHmo, BTEX and total lead. <br /> —=-.Please�WI-our office- ar(209)"579=222 --i yo—a-have any questions or comments'regarding this- - <br /> project. <br /> Sincerely, <br /> Smith Environmental Technologies Corporation <br /> 1 * 1 <br /> William Madison <br /> Staff Geologist <br /> —71 <br /> Jeanne Homsey <br /> f CA Registered Civil Engineer No. C47410 <br /> k <br /> Attachments: <br /> cc: Mr. Eraclis Tsirelas <br /> I� <br /> I <br /> i <br /> i1 <br /> FI� " <br /> S <br /> 'J <br /> 951131LE`IT &L-I10995.doc 2 <br /> • <br /> SMTH <br /> F <br />