Laserfiche WebLink
MONITORING WELL INSTALLATION FIRM INFORMATION <br /> ResonantSonic International <br /> 220 N. East Street <br /> Woodland, CA 95776 <br /> P: (530) 668-2424 <br /> F: (530) 668-2429 <br /> Contact: Derrik Sandberg <br /> PROPOSED WORK SCHEDULE <br /> The installation of these two monitoring wells will commence immediately upon <br /> completion of the soil fracturing/EZVI injections that is scheduled to occur April 11-15, <br /> 2005. It is possible these wells may be installed as late as April 18-19, 2005. <br /> PERMITTING <br /> We are submitting this document to obtain the monitoring well installation permit at this <br /> time along with the fee of$89.00. <br /> If you have any questions or require additional information,please call me at telephone number(708) <br /> 579-5976 if you have any comments or concerns. <br /> Sincerely yours, <br /> �/ <br /> Linda L. Huff, P.E. <br /> President <br /> Enclosure <br /> cc: Dan Decker, ContiGroup Companies, Inc. <br /> RACONTGRAMCC14Cargill[Trench Camp\2005 Correspondence\Monitoring Well Installation I ettendoc <br />