Laserfiche WebLink
Mr. Daniel Decker 0 -2 - . 22 July 2002 <br /> 1. The Work Plan does not include a discussion of how ContiGroup will ensure that the flex <br /> hose from the extraction well to the holding tank will remain intact and undisturbed so as <br /> to prevent any potential unauthorized releases. ContiGroup must provide this <br /> information. <br /> 2. The monthly groundwater sampling of the extraction well and three surrounding <br /> monitoring wells must meet the maximum detection limits and required analytical <br /> methods as listed in the MRP. <br /> Board staff concurs with the Work Plan provided that ContiGroup provides a response to the <br /> above comments by 19 August 2002. By 31 January 2003,please submit a test evaluation <br /> report including recommendations for full-scale remediation. If you have any questions, you may <br /> contact me at (916) 255-3119. <br /> i a Z_O_�-Q,_" <br /> DEVRA LEWIS <br /> Environmental Scientist <br /> cc: Mr. Jeff Wong, San Joaquin County Health Department, Stockton <br /> Ms. Linda Huff, Huff&Huff, LaGrange, Illinois <br /> Mr. Joe Weidmann, Haley& Aldrich, Inc., San Diego <br />