My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 12:11:07 PM
Creation date
1/31/2020 11:05:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quik Stop Market No.132 July 3,200E <br /> PAGE <br /> WELL DESTRUCTION <br /> i <br /> ATC will contract with a local licensed driller to drill-out the borehole and casing of each of the two <br /> monitoring wells. An ATC geologist, under the supervision of a State of California Professional r! <br /> Geologist or Engineer, will observe the activities, document the progress, and communicate with the <br /> county inspector during the inspection visit. <br /> Drill cuttings and recovered well parts will be stored in Department of Transportation (DOT) approved <br /> containers (55-gallon drums). The drums containing drilling waste will be disposed at an appropriate <br /> facility. Boreholes will be backfilled with bentonite and cement as per San Joaquin County regulations. <br /> The surface will be patched with material to match the surrounding surface. <br /> WELL DESTRUCTION REPORT AND PROJECT MANAGEMENT <br /> i <br /> ATC will develop a well destruction report that includes the required SJCEHD documentation, including <br /> site plans. The Well Destruction Report will be submitted to Quik Stop Markets, the SJCEHD, and to <br /> the California RWQCB. <br /> SCHEDULE <br /> Due to the expiration date of the current offsite access agreement, all field work will be completed by <br /> July 31, 2006. <br /> If you have any questions or need clarification regarding this workplan, please contact either of the <br /> undersigned at(925)460-5300. <br /> Very truly yours, <br /> ATC ASSOCIATES INC. <br /> , r <br /> Jonathan Flomerfelt Jeanne Homsey,P.E.47410 <br /> Staff Scientist/Branch Safety Officer Branch Manager <br /> KA NE <br /> cc: Michael Karvelot <br /> HOS f ' <br /> No. GC 7s".x10 r f <br /> CI�lL ti@ <br /> } <br />
The URL can be used to link to this page
Your browser does not support the video tag.