Laserfiche WebLink
NRC Equity Fund 1 <br /> SCENARIO TWO—LEVEL OF SIGNIFICANCE AFTER MITIGATION <br /> MITIGATION SOLUTION <br /> Because NRCEF recognizes the potential for this operation to contribute to congestion on <br /> Locke Road, a mitigation solution was developed. In essence, the solution entails <br /> staggering employee schedules to off-peak times; and, changing retail hours to off-peak <br /> times. <br /> LOCKE ROAD LOCKE ROAD <br /> PEAKTRAFFIC OFF-PEAK TRAFFIC <br /> :ROAD NAME AVERAGE DAILY AM PEAK PM PEAKOFF-PEAKAM OFF-PEAK PM <br /> VOLUMETRAFFIC •LUME VOLUME VOLUME <br /> EXISTING TRAFFIC -5 50 50 A-, 0 0 <br /> ADDITIONAL NEW TRAFFIC FROM OPERATION <br /> RETAIL TRAFFIC 175 0 0 75 100 <br /> EMPLOYEE TRAFFIC 80 0 0 80 80 <br /> NEw TRAFFIC ToTALs 330 50 50 155 180 <br /> CHANGE IN ADT +255 0 0 +155 +180 <br /> (Left Intentionally Blank) <br /> Page 19 1 54 <br />