My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2900 - Site Mitigation Program
>
PR0524672
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 2:57:57 PM
Creation date
2/6/2020 8:34:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524672
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0016571
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTE
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
953049518
APN
23912001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
23500 KASSON RD TRACY 953049518
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Focused Groundwater Investigation Work Plan <br /> Deuel Vocational Institution(DVI), Tracy, California Investigation Rationale <br /> 2.0 Investigation Rationale <br /> Based on the 2022 Annual Groundwater Monitoring Report and Site Investigation Summary Report, a <br /> GW investigation is recommended to further characterize the nature and extent of PCE and TCE <br /> contamination near the previous exceedances at MW-9-BP. To accomplish this investigation,three soil <br /> borings will be advanced in the vicinity of MW-9-BP and SG-4 through SG-8. Permanent GW MWs may <br /> be installed in this area if deemed necessary based on the analytical results of the grab GW samples. <br /> 2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.