Laserfiche WebLink
• Hold daily Tailgate Safety Meetings prior to work start. Use Attachment 8 to document <br /> initial Tailgate Safety Meetings at the beginning of a project and/or when commencing new <br /> job tasks in new areas. <br /> • Use monitoring instruments and follow designated action levels specified in Sections 5.4 <br /> and 5.5 and Table 5-2. <br /> • Use personal protective equipment (ppe) as specified in Section 5.3 and Table 5-1. <br /> • Try to remain upwind of operation. <br /> • Vent wells from an upwind position. <br /> • No work will be conducted without adequate natural light or without appropriate <br /> supervision. <br /> • Dust control measures may be needed on roads that cross the exclusion zone. <br /> • Spoils from excavation work should be placed so as not to be in the expected paths of <br /> travel. <br /> • Drilling cuttings should be kept shoveled up and drummed, out of the way of workers. <br /> Liquids generated during drilling should be contained out of the way to limit the amount <br /> of mud created around the rig. <br /> • Care should be taken to limit the extent that a piece of equipment comes into contact with <br /> contamination (e.g. on backhoes, limit contact to the arm and bucket). <br /> • A work/rest regime will be initiated when ambient temperatures and protective clothing <br /> create a potential heat stress situation. <br /> 26 <br />