Laserfiche WebLink
SWRCB, January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(if applicable)should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: MANTECA EXPRESSDate of Testing: APR 9, 2008 <br /> Facility Address: 419 S. MAIN STREET, MANTENCA, CA 95336 <br /> Facility Contact: BOBBY MANGAT IPhone: (209)401-5292 <br /> Date Local Agency Was Notified of Testing: MAR 25, 2008 <br /> Name of Local Agency Inspector(ifpresent during testing): MUNIAPPA NAIDU <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: TANK-TEK ENVIRONMENTAL CORPORATION <br /> Technician Conducting Test: MIKE LAWRENCE <br /> Credentials: ® CSLB Contractor ® ICC Service Tech. ® SWRCB Tank Tester ❑Other(Specify) <br /> License Number(s): 803705 (CSLB Contractor) -- 1048103-UT(ICC Service Tech.) -- 90-1200 (SWRCB Tank Tester) <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other(Spec) <br /> Test Equipment Used: VISUAL Equipment Resolution: <br /> Identify Spill Bucket(By Tank <br /> Number, Stored Product, etc.) 91 FILL 87 FILL DIESEL FILL <br /> Bucket Installation Type: ® Direct Bury ® Direct Bury ® Direct Bury ❑ Direct Bury <br /> ❑ Contained in Sump ❑ Contained in Sump ❑ Contained in Sump ❑Contained in Sump <br /> Bucket Diameter: 11.50" 11.50" 11.50" <br /> Bucket Depth: 15.00" 15.00" 15.00" <br /> Wait time between applying 0 0 0 <br /> vacuum/water and start of test: <br /> Test Start Time(Tt): 9:00 AM 9:00 AM 9:00 AM <br /> Initial Reading(Rj): 13.50" 13.50" 13.50" <br /> Test End Time(TF): 10:00 AM 10:00 AM 10:00 AM <br /> Final Reading(RF): 13.50" 13.50" 13.50" <br /> Test Duration(TF—TI): 1 HR 1 HR 1 HR <br /> Change in Reading(RF-Rt): 0 0 0 <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: <br /> g Date: APR 9,2008 <br /> ` State laws and regulations do not currently require testing to be performed by a qualified contractor.However, local requirements <br /> may be more stringent. <br />