My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_2005 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 4:59:42 PM
Creation date
2/19/2020 10:50:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2009
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
419 S Main Street, Manteca <br /> Page 2 <br /> 5. Qualified service technicians shall possess or work under the direct and personal <br /> supervision of an individual physically present at the work site who possesses all <br /> of the following: <br /> a. One of several permissible valid, current contractor's licenses issued by <br /> the Contractors State License Board(may be issued to the installation <br /> company), and <br /> b. A valid, current California UST Service Technician certificate issued by <br /> the International Code Council(ICC), and <br /> c. A valid, current certificate of training from the manufacturer(s)of the <br /> component(s)being tested. <br /> d. Each individual installing or testing any component shall hold a certificate <br /> of training from the manufacturer of that component. <br /> 6. Complete and submit a copy of a Underground Storage Tank Certification of <br /> Installation/Modification (Former Form C)to this office no later than 30 days <br /> after work is completed. <br /> 7. Contractor must provide information regarding the conversion adaptor frame from <br /> the dealer as soon as the frame is purchased. <br /> 8. The technician must print out a copy of the alarm history prior to performing the <br /> "cold start"of the Veeder Root system and have the copy available at the time of <br /> EHD inspection for review. <br /> 9. A secondary containment testing must be performed for the entire tank system <br /> once it is in operating condition. <br /> 10. Permit expires 180 days from date of approval. If an extension to the expiration <br /> date is required, a written request must be submitted to this office prior to the <br /> expiration date. <br /> If you have any further questions,please contact me at(209) 468-3439. <br /> Thank you, <br /> J7 <br /> Muniappa Naidu <br /> Senior Registered Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.