Laserfiche WebLink
. F <br /> • Site Assessment Work Plan Ouiline - 3 - 28 November 2012 <br /> Sample collection and preservation method <br /> QA/QC procedures <br /> G. Water Level Measurement <br /> Elevation reference point at each monitoring well shall be within 0.01 foot. <br /> Ground surface elevation at each monitoring well shall be within 0.1 foot. <br /> Method and time of water level measurement shall be specified. <br /> IV. QA/QC PROCEDURES <br /> Specify number of field blanks and duplicates. <br /> V. TIME SCHEDULE FOR PROPOSED WORK <br /> The work plan shall include a time schedule for implementation of work. <br />