My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:41:34 PM
Creation date
2/27/2020 3:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1.11.After installation and before backfilling to grade,testing must 3.2.5.Close the air-supply valve on the test manifold.Disconnect <br /> be repeated to verify that no damage has occurred during installation. the air-supply line. <br /> WARNING 3.2.6.Soap the entire exterior of the tank,checking for leaks. <br /> When the tank is under pressure,the manways and/or (Follow instructions in Points 3.1.6.through 3.1.8.,including <br /> fittings may dislodge,or the tank could rupture and result Warnings following 3.1.8.)Watch for active air bubbles,which <br /> in death or serious injury.Before beginning the test,notify indicate a leak.Pay special attention to fittings and manways. <br /> all people on the test site to remain in a safe location. <br /> ALWAYS ATTEND TO THE TANK DURING THE TEST.Stand 3.2.7.Monitor the pressure for one hour. <br /> clear of manways,fittings and tank ends during the test. 3.2.8.When the test is complete,carefully release the air <br /> pressure from the tank by opening the air-supply valve. <br /> WARNING <br /> The maximum testressure is 5 sig[3 psig fora 12-foot- <br /> 3.2.9.When airflow stops,remove the test manifold. <br /> p p <br /> diameter tank].Position the pressure gauge so that the pressure 3.2.10. Replace the protective covers in the service fittings. <br /> readings can be clearly read at all times.Failure to follow this <br /> waming could result in death or serious injury.(See FIGURE 3-2.) 3.3.TESTING A DOUBLE-WALL TANK WITH A DRY <br /> INTERSTITIAL SPACE <br /> IIIII— = I 3.3.1.GENERAL <br /> IIIII I I= III 3.3.1.1.The tank will arrive with a quick-disconnect assembly. <br /> I II (See FIGURE 3-4.) <br /> I=11 eMs,9 11= II <br /> I II I IIIIIII 3.3.1.2. If the tank is not configured as shown in FIGURE 3-4 <br /> III= prior to preinstallation testing,call the UST coordinator at the <br /> Xerxes plant nearest you. <br /> IIIII —1 <br /> 3.3.2.PRIMARY TANK(INTERNAL) <br /> FIGURE 3-2 3.3.2.1.Remove all temporary service-fitting plugs. <br /> 3.3.2.2.Redope fittings and install plugs in all openings,except <br /> A WARNING one service fitting(needed for the test manifold).Follow <br /> The pressure-relief device or regulated air source must be instructions in Point 3.1.5. <br /> rated at a maximum of 6 psig[4 psig for a 12-foot-diameter <br /> tank]to reduce the risk of overpressurizing the tank.Failure 3.3.2.3.Install the test manifold in the open service fitting.Connect <br /> to follow this warning could result in death or serious injury. the pressure source to the test manifold.(See FIGURE 3-4.) <br /> 3.2.TESTING A SINGLE-WALL TANK ----------- <br /> 3.2.1.Remove all temporary service-fitting plugs. — : Tie a <br /> 3.2.2.Redope fittings and install plugs in all openings,except <br /> one service fitting(needed for the test manifold).Follow <br /> instructions in Point 3.1.5. Quick-Dmirrlect <br /> Assembly <br /> 3.2.3.Install the test manifold in the open service fitting.Connect Monitor Fitting <br /> the pressure source to the test manifold.(See FIGURE 3-3.) - <br /> Air-Supply <br /> Valve <br /> Al,-Supply Air-Supply <br /> Gauge�.O O��Gauge FIGURE 3-4 <br /> Pressure-Relief <br /> Device <br /> 3.3.2.4.In order to test the primary tank alone,the quick- <br /> disconnect assembly must not be connected to the service <br /> fitting—keep the nylon tie in place. <br /> 3.3.2.5.Pressurize the primary tank to 5 psig[3 psig for a 12- <br /> foot-diameter tank].Allow the pressure to stabilize by adding or <br /> FIGURE 3 3 removing air as necessary. <br /> 3.2.4.Pressurize the tank to 5 psig[3 psig for a 12-foot-diameter 3.3.2.6.Close the air-supply valve on the test manifold. <br /> tank].Allow the pressure to stabilize by adding or removing air Disconnect the air-supply line. <br /> as necessary. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.