My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:41:34 PM
Creation date
2/27/2020 3:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.3.2.7.Soap all service fittings and manways.Watch for active fitting.Follow instructions in Point 3.1.5.Do not open the <br /> air bubbles,which indicate a leak. monitor fitting(if present)or monitoring fluid could be lost. <br /> 3.3.2.8.Monitor the pressure for one hour. 3.4.1.6.Install the test manifold in the open service fitting.Connect <br /> the pressure source to the test manifold.(See FIGURE 3-5.) <br /> 3.3.3.SECONDARY TANK(EXTERNAL) <br /> 3.3.3.1.Maintain the pressure in the primary tank. <br /> Air-Supply <br /> Valve Reservoir Fitting <br /> Nr-Suppy <br /> Air-Supply Gauge <br /> CAUTION Gauge <br /> Pressure-Relief <br /> Do not connect air supply directly to the interstitial-space Device <br /> monitor fitting.Pressurizing the secondary tank(interstitial <br /> space)by itself may damage the primary tank or cause <br /> tank failure. <br /> 3.3.3.2.Free the hose from the service fitting by cutting the <br /> nylon tie. FIGURE 3-5 <br /> 3.3.3.3.Insert the hose into the quick-disconnect fitting.This will 3.4.1.7.Pressurize the primary tank to 5 psig.Allow the <br /> allow air to transfer from the primary tank to the secondary tank. pressure to stabilize by adding or removing air as necessary. <br /> 3.3.3.4.Reconnect the air-supply line.Allow the pressure to 3.4.1.8.Close the air-supply valve on the test manifold. <br /> stabilize at 5 psig[3 psig for a 12-foot-diameter tank]by adding Disconnect the air-supply line. <br /> or removing air as necessary. <br /> 3.4.1.9.Soap all service fittings and manways.Watch for active <br /> 3.3.3.5.Close the air-supply valve on the test manifold. air bubbles,which indicate a leak.Look through the laminate for <br /> Disconnect the air-supply line. any active air bubbles rising to the top.Their presence would <br /> 3.3.3.6.Soap the entire exterior of the tank,checking for leaks. indicate an internal leak.Also,check the reservoir for bubbles in <br /> (Follow instructions in Points 3.1.6.through 3.1.8.,including the monitoring fluid.(The monitoring-fluid level will rise <br /> Warnings following 3.1.8.)Watch for active air bubbles,which during the air test.) <br /> indicate a leak.Pay special attention to fittings and manways. 3.4.1.10.Monitor the pressure for one hour. <br /> 3.3.3.7.Monitor the pressure for one hour. 3.4.1.11.When the test is complete,carefully release the air <br /> 3.3.3.8.When the test is complete,carefully release the air pressure from the tank by opening the air-supply valve. <br /> pressure from the tank by opening the air-supply valve. 3.4.1.12.When the airflow stops,remove the test manifold. <br /> 3.3.3.9.When the airflow stops,remove the test manifold. 3.4.1.13.Check the level of the monitoring fluid in the reservoir. <br /> 3.3.3.10.Replace the protective covers in the service fittings. It should be at approximately the same level as the pretest level. <br /> 3.4.TESTING A DOUBLE-WALL TANK WITH A WET 3.4.2.SECONDARY TANK(EXTERNAL) <br /> INTERSTITIAL SPACE CAUTION <br /> CAUTION Never pressurize a wet interstitial space.Doing so may <br /> Never pressurize a wet interstitial space.Doing so may damage the primary tank or cause tank failure. <br /> damage the primary tank or cause tank failure. 3.4.2.1.Check the exterior of the tank for monitoring fluid.(The <br /> 3.4.1.PRIMARY TANK(INTERNAL) monitoring fluid is dyed blue to distinguish between moisture <br /> 3.4.1.1.Keep the tank vertical(the reservoir on top)at all times and monitoring fluid.)If monitoring fluid is found,wipe the tank <br /> or the monitoring fluid may drain from the reservoir. dry and verify that the monitoring fluid does not reappear.Lift <br /> the tank to check the bottom.Do not roll the tank. <br /> 3.4.1.2.Remove all temporary service-fitting plugs and the <br /> reservoir-fitting plug. A WARNING <br /> 3.4.1.3.Check the monitoring-fluid level in the reservoir.It Do not lift the tank when the tank is under pressure. This <br /> should be about 1/4 full. could result in death or serious injury. <br /> 3.4.1.4.Visually check the interior of the tank for monitoring 3.4.2.2.Visually check the interior of the tank for monitoring <br /> fluid.There should not be any. fluid.There should not be any. <br /> 3.4.1.5.Redope fittings and install plugs in all openings,except 3.4.2.3.Replace the protective covers in the service fitting and <br /> one service fitting(needed for the test manifold)and the reservoir the reservoir fitting. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.