My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2325
>
2200 - Hazardous Waste Program
>
PR0505915
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 11:19:40 AM
Creation date
3/2/2020 11:01:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505915
PE
2227
FACILITY_ID
FA0007080
FACILITY_NAME
BBB Industries DBA QBR BRAKE INC
STREET_NUMBER
2325
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
Way
City
Stockton
Zip
95206
APN
16334008
CURRENT_STATUS
02
SITE_LOCATION
2325 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
757
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. The Plant Management shall assess the effectiveness of the evacuation drill <br />exercise and shall insure that corrective actions are implemented and <br />documented in the event the EA/CP evacuation protocol should fail. <br />8.6 Post -Emergency Response Protocol <br />QB REBUILDERS' EA/CP post emergency response actions are designed to mitigate the <br />opportunity of a secondary incident and prevent the recurrence of the incident through <br />investigation and corrective action. <br />8.6.1 Mitigation of Secondary Incident <br />1. The Plant Management shall take all necessary steps to prevent a secondary <br />incident as follows: <br />a. Monitor all pressure valves; <br />b. Inspect for any leaks or cracks in pipes, valves, tanks, drums and <br />cylinders; <br />C. Inspect for gas generation; <br />d. Segregate potential non -compatible materials; <br />e. Shut down all potentially impacted operations <br />2. The Plant Management shall specify the frequency of monitoring or <br />inspection based on the nature of the initial emergency incident, types of <br />materials or operations/processes involved and the likelihood of a secondary <br />incident. <br />3. All operations that were shut down in response to the incident shall not be <br />reactivated until the Plant Management has given the "ALL CLEAR" order <br />and only after the incident has been abated and is under control. <br />8.6.2 Incident Investigation and Implementation of Corrective Actions <br />1. The Plant Manager, or his designated representative, shall be responsible <br />for initiating all post -incident investigations to determine incident cause and <br />corrective actions, including employee debriefing and retraining. <br />2. The Plant Manager shall conduct debriefing of site personnel and local <br />agencies to assess preparedness and prevention activities, response <br />activities , injury control and evacuation procedures. <br />3. Based on the investigation, corrective actions shall be identified and <br />implemented. <br />Draft HMMP <br />March, 2000 HMMP-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.