My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2325
>
2200 - Hazardous Waste Program
>
PR0505915
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 11:19:40 AM
Creation date
3/2/2020 11:01:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505915
PE
2227
FACILITY_ID
FA0007080
FACILITY_NAME
BBB Industries DBA QBR BRAKE INC
STREET_NUMBER
2325
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
Way
City
Stockton
Zip
95206
APN
16334008
CURRENT_STATUS
02
SITE_LOCATION
2325 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
757
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1:• <br />from storm water runoff and/or reduce the volume of storm water which is <br />discharged offsite. <br />This section describes and establishes QBR's Storm Water Pollution Prevention Plan in <br />accordance with the requirements of the GENERAL PERMIT. QBR=s SWPPP BMPs <br />emphasizes both administrative controls and structural controls in minimizing storm <br />water pollution. Facility personnel will, on an continuing basis, identify and implement <br />additional administrative and structural controls should the existing BMPs prove to be <br />ineffective in controlling storm water pollution at the site. <br />1.4 Pollution Prevention Team <br />The first step in developing the SWPPP is to identify individuals within the facility's <br />organization who will be members of the facility=s Storm Water Pollution Prevention Team <br />(SWPPT). The SWPPT is made up of key on-site personnel who are familiar with the facility <br />and its operations. The SWPPT is comprised of representatives from all phases of the <br />facility's operations. It includes personnel from management, operations, waste material <br />handling, maintenance, and shipping and receiving. <br />The SWPPT is responsible for developing the SWPPP and assisting in its implementation, <br />maintenance, and revision. The SWPPT provides structure and direction to the facility's <br />storm water management program. It also provides a point of contact for other facility <br />personnel and regulatory officials to discuss specific aspects of the site=s SWPPP. <br />Organization and management of the site's SWPPT is the responsibility of the site's SMP <br />Coordinator. The SMP Coordinator is responsible for insuring and certifying on the <br />Annual Report that the site is in compliance with the GENERAL PERMIT. This person <br />must be an owner/operator of the business, or representative of the owner/operator, <br />who has the authority to make resources (i.e, personnel, equipment and funds) available <br />to insure that the site complies with the GENERAL PERMIT requirements. <br />A SWPPT has been formed for QBR. The SWPPT is responsible for the following: <br />X Implementing GENERAL PERMIT and SMP requirements; <br />X Defining and agreeing upon an appropriate set of goals for the facility's storm water <br />management program; <br />CATEMMMPREV2.doc Section 1-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.