Laserfiche WebLink
kTJ KLEINFELDER <br /> • Adequate work space and access will be provided. Kleinfelder will attempt to advance the <br /> soil borings at the proposed locations. If the drilling equipment cannot be positioned, <br /> alternative drilling locations or sampling methods should be investigated. The borings are <br /> to be drilled with a hand auger. If alternative drilling methods or concrete cutting are <br /> required, additional costs may be incurred. <br /> • No respiratory protection or shoring will be necessary. _ <br /> • Soil and water generated during the drilling and sampling will be the responsibility of the <br /> client, and disposal costs have not been included in our estimate. Soil cuttings will be <br /> placed on plastic and covered adjacent to the chosen boring locations. Water generated <br /> from equipment decontamination rinseate will not be contained. Disposal or remediation <br /> options for the soil can be assessed once analytical results have been received, at an <br /> additional charge. Kleinfelder can assist the client with the disposal of soil and water if <br /> necessary, at an additional charge. <br /> • Excavation, transportation and disposal are not included in Kleinfelder's attached cost <br /> estimate. <br /> • The client will be responsible for locating all underground utilities and other subsurface <br /> structures that could interfere with drilling operations or be damaged during drilling. <br /> Failure to locate such lines or structures will be the sole responsibility of the client. <br /> Underground Services Alert(USA) at 1-800-642-2444 provides this service free of charge <br /> for major utility lines. Kleinfelder can make contact with USA for a site visit, if <br /> requested. <br /> IV. PROJECT TIME SCHEDULE <br /> Upon receipt of our signed contract, the estimated time schedule will be as follows: <br /> STANDARD ANALYTICAL TURN-AROUND TIME <br /> Approximate Time Task <br /> Week- 0 Notification of proposal acceptance in writing(signed contract) <br /> Week 0 -1 Task 1 and Task 2 - Workplan Preparation, Permitting*, and Soil <br /> Sample Collection <br /> Week 0 - 1 Task 2 -Chemical Analyses** <br /> Week 2 Task 3 - Reporting <br /> * The time estimated for permitting is approximate. Kleinfelder has no control over the time <br /> expended for regulatory agency activities. <br /> 20-YP7-208/2017P I 57/2017C344 Page 4 of 7 <br /> 0 1997 Kleinfelder,Inc. November 6, 1997 <br />