Laserfiche WebLink
APPENDIX A - REPORTING 30 August 1991 <br /> Placement method of annular space - proposed continuing or next phase of <br /> materials; e.g. tremmie pipe, poured investigation; <br /> from the surface, not placed, etc.; - method of cleanup proposed or impie- <br /> - Detail of the location of screening, mented to date; <br /> bentonite seal, sanitary seal, etc.; - time schedules for the completion of the <br /> - Nominal inner diameter (ID) and outer investigation of the site and remediat- <br /> diameter (OD) of the auger and casing; ion- <br /> - Copies of drillers and/or geologists logs - method and location of disposal of the <br /> for drilling and construction; released hazardous substance and any <br /> - Any field notes from development and contaminated soil, ground water or <br /> purging of the well and descriptions of surface water <br /> difficulties encountered during drilling; - manifest required for transport of haz- <br /> and ardous subsianccs; <br /> - Type of rig equipment used for well - monitoring well data including ground <br /> construction, development method, water elevation, pH, conductivity, <br /> volumes purged from the well and temperature and gradient; <br /> names and license numbers of the com- - tabulated analytical results of ground <br /> pany, geologist and driller identified. water or soil sampling; <br /> a site map showing the 'zero line' of <br /> All report mans are to be prepared as follows: c°ntaminaLn, if known, and changes in <br /> All maps oriented with north u the analyses and gradient measurements <br /> P on over the last quarter, <br /> page. - tabulated data for ail monitoring wells <br /> A scale proportional to map size including ground water elevations <br /> included, e-g, I—S—JS_I collected to date- <br /> =10 feet. - a site map delineating ground water <br /> Show all above ground structures in- elevation contours based on recent data; <br /> eluding canopies and power lines. if the site is in remediation, define the <br /> Indicate buried pipes, tanks (with each zone of capture for any extraction <br /> tank labeled for content), leachlines, Weil(s) on the contour ma <br /> utilities, -etc. tabulated tabulated analytical results from all <br /> Qty Stones - � �d previous sampling events including <br /> l laboratory reports for the most recent <br /> Tank owners, operators, or permittees. are todocumentation;nL and chain of custody <br /> report at least quarterly to the Local Im le- _ site <br /> P e map delineating contamination <br /> menting Agency and the Regional Board until <br /> contours for soil• and ground water <br /> investigation and cleanup of the site is deemed based on recent data; <br /> adequate (more frequent reporting compliance - tank owner commitment letter, <br /> may be required by the Local Implementing - the quantity of <br /> Agency or the Regional Board). These reports q °and water, vapors, <br /> cu <br /> Po and hydrocarbons removed (in gals., cu. <br /> are to show the: ftp and lbs., respectively), during the <br /> reporting period and cumulative to date; <br /> status. of investigation and cIeanu _ <br /> P ac- times and dates equipment was not <br /> tivitics including the results of all inves- operatinst, cause of shutdown, <br /> tigations implemented to date and a <br /> corrective action plan to insure similar <br /> shutdowns do not reoccur (proposed <br /> A-3 <br />