Laserfiche WebLink
Mar-20-97 09:26A Feb. P.05 <br /> 1S February 1997 <br /> AGE-NC Proposal N6. 1265(R) <br /> Page 2 of 3 <br /> UTILITY HOOKUPS <br /> *Natural Gas Connection(estimated) $1,000.00-$2,000.00 <br /> y <br /> SOIL VAPOR EXTRACTION SYSTEM'OPERATION AND MAINTENANCE . <br /> Monthly Rental and.Mainteflance of ThetrmaKatalytic Oxidizer $2,700.00 <br /> Installation/Haokup S 700.00 <br /> STARTUP.AND TESTING <br /> Monitoring and Testing,(for the first week) $ 1,000.00 <br /> Field Equipment Included <br /> Laboratory Analysis for Vapor Samples $ 400.00 <br /> ANNUAL REPAIRS,MAINTENANCE AND SUPPLIES <br /> Field Equipment S 1,000.00 <br /> Minor Repairs/Supplies S .1,000.00 <br /> OPERATING COSH'S <br /> Vapor Sampling (Included in Routine Operation) <br /> Annual Analysis for Vapoi Samples $ 900.00 <br /> *Natural'Gas Usage $200.00-$1,500.001nmonth <br /> CONFIRMATION SOIL SAMPLING <br /> Soil Probing and sampling` $ 1,550.00 <br /> Laboratory Analysis S 400.00 <br /> REPORTING <br /> Remediation Progress Quarterly.Reports 5 650.00 <br /> Nom.• . <br /> * The cost will be billed directly to you by the respective companies/suppliers/agencies. The <br /> costspecii ed in thispropotal is based on our.experienced at similar sites and the actual cost <br /> Play differfrom the ores specified In this;proposal.'Furthermore, these costs are not included <br /> in Total Cost of the project. <br /> 3.0: DISCUSSION <br /> Our company has initiated.,operated and completed'vapor extraction projects throughout California. <br /> As a licensed contractor,typically,,we will perform the construction portion of remediation projects <br /> in-house to increase the cost effeciiveness,passing the savings on to you the client. <br /> d 00L0 S55 6W ON My NObA V1d l E;V L661-6 t-c <br /> i, p <br />