My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 4:58:04 PM
Creation date
3/5/2020 4:22:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y. <br /> Proposed Work Plan November 4 , 1988 <br /> U.S.A. Petroleum Station No. 65, Lodi, California AGS 87050-3 <br /> will be backfilled with neat cement or a cement/bentonite slurry <br /> to a few inches below grade. <br /> A cast-aluminum utility box with a PVC apron will be situated <br /> over each well head and set in concrete placed flush with the <br /> surrounding concrete pad. This box has a watertight seal to <br /> protect against surface-water infiltration and requires a <br /> specially designed wrench to open. The possibility of either <br /> vandalism to or accidental disturbance of the well is reduced. <br /> GROUND-WATER SAMPLING <br /> The wells will be developed prior to water sampling by swabbing, <br /> surge pumping, or another suitable method. Applied GeoSystems <br /> will wait a minimum of 24 hours between developing and water <br /> sampling. Following ground-water recovery to static conditions <br /> and an initial water-level measurement, the wells will be sampled <br /> using a Teflon bailer cleaned with Alconox and deionized water. <br /> The bailer will be used first to obtain a sample from the surface <br /> of the water in the well prior to purging. Any subjective <br /> evidence of product detected in the wells will be recorded. <br /> Purged water will be placed in Department of Transportation 17-E <br /> 55-gallon drums and left an the site. Applied GeoSystems can <br /> 10 <br /> App/ied GeoSystems <br />
The URL can be used to link to this page
Your browser does not support the video tag.