My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 4:58:04 PM
Creation date
3/5/2020 4:22:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 29, 1987 - _ - AGS 87050-1 <br /> USA Station #65, Lodi, California <br /> SOIL BORING/SAMPLING <br /> The soil borings will be excavated using a drilling rig equipped <br /> with eight inch diameter continuous-flight, hollow-stem augers. <br /> No drilling fluids or additives will be used. 'Auger flights will <br /> be steam cleaned -before to use to minimize the possibility of <br /> down-hole or cross-hole contamination. <br /> The drilling will be- performed under the guidance of a field <br /> - <br /> geologist and the earth materials in the boring will be logged as <br /> drilled. During drilling., soil samples will be collected at 5- <br /> foot intervals using a California modified split spoon sampler <br /> ( 2-1/2 inch I .D. ) equipped with laboratory-cleaned brass sleeves. <br /> Samples will be- collected by advancing the boring to a point <br /> immediately above the sampling depth; then driving the sampler <br /> into the native soil through the hollow center of the auger. The <br /> sampler will be driven- 18 inches with a standard 140 pound_ hammer <br /> dropped 30 inches. The number of blows required to drive the <br /> sampler each successive 6 inches will be counted andrecorded to- <br /> give <br /> ogive an indication of -soil consistency. Copies of a Field Boring <br /> Log, as well as a Boring Log Plate used in our final report, are <br /> included with this work plan. <br /> .4,00/ied GeoSystems <br />
The URL can be used to link to this page
Your browser does not support the video tag.