Laserfiche WebLink
Condition of nozzles, flanges, fittings at tank: Good Condition <br /> Condition of piping: Good Condition <br /> Visual Inspection findings: A visual inspection of the tank and its affiliated <br /> pumps, piping and ancillary equipment did not reveal signs of leaks, corrosion, <br /> weld cracks or breaks, or scrapes in protective coating which may cause a <br /> release from the tank system. A description of all discrepancies noted during the <br /> visual inspection is included with this report. Initials: <br /> Seismic/Anchoring: <br /> Seismic/dynamic/hydrostatic load calculations provided as Appendix "D" <br /> Seismic/Anchoring findings: The tank as designed and operated, and the <br /> containment area in which it is located are adequately anchored and are <br /> seismically sound. Initials: <br /> Leak Test: "U's W, <br /> Interior and secondary tanks were pressure tested at 5 psig for 2 hours at <br /> time of manufacture per UL 142. The tank complied with the requirements <br /> of UL 142 at time of shipping. <br /> A tightness test of the entire system was performed on the date of this <br /> inspection. All vent and inspection fittings were replaced with threaded <br /> plugs. Air pressure of 1.0 psig was applied by means of using the <br /> diaphragm fill pump connected to an empty oil drain caddy. The system <br /> held the initial pressure for 30 minutes without any drop. <br /> Integrity testing findings: Based on the above noted integrity test and the <br /> results obtained from that test, the tank has sufficient integrity for its intended <br /> use. Initials: k� <br /> Tank Drawing: <br /> Please see Appendix "A" and "B" <br /> Primary Tank Volume Calculations <br /> Tank Length: 3'-9" (interior) <br /> 5 <br />