My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1700
>
2200 - Hazardous Waste Program
>
PR0513687
>
COMPLIANCE INFO_PRE 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 12:24:08 PM
Creation date
3/6/2020 10:36:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2018
RECORD_ID
PR0513687
PE
2228
FACILITY_ID
FA0009181
FACILITY_NAME
LODI HONDA
STREET_NUMBER
1700
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
1700 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Condition of nozzles, flanges, fittings at tank: Good Condition <br /> Condition of piping: Good Condition <br /> Visual Inspection findings: A visual inspection of the tank and its affiliated <br /> pumps, piping and ancillary equipment did not reveal signs of leaks, corrosion, <br /> weld cracks or breaks, or scrapes in protective coating which may cause a <br /> release from the tank system. A description of all discrepancies noted during the <br /> visual inspection is included with this report. Initials: <br /> Seismic/Anchoring: <br /> Seismic/dynamic/hydrostatic load calculations provided as Appendix "D" <br /> Seismic/Anchoring findings: The tank as designed and operated, and the <br /> containment area in which it is located are adequately anchored and are <br /> seismically sound. Initials: <br /> Leak Test: "U's W, <br /> Interior and secondary tanks were pressure tested at 5 psig for 2 hours at <br /> time of manufacture per UL 142. The tank complied with the requirements <br /> of UL 142 at time of shipping. <br /> A tightness test of the entire system was performed on the date of this <br /> inspection. All vent and inspection fittings were replaced with threaded <br /> plugs. Air pressure of 1.0 psig was applied by means of using the <br /> diaphragm fill pump connected to an empty oil drain caddy. The system <br /> held the initial pressure for 30 minutes without any drop. <br /> Integrity testing findings: Based on the above noted integrity test and the <br /> results obtained from that test, the tank has sufficient integrity for its intended <br /> use. Initials: k� <br /> Tank Drawing: <br /> Please see Appendix "A" and "B" <br /> Primary Tank Volume Calculations <br /> Tank Length: 3'-9" (interior) <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.