My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 11:24:52 AM
Creation date
3/9/2020 9:59:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geologicall rechaks/etc. Page 7 <br /> Additional Pilot Test Work Plan <br /> Project No.770.2 . <br /> October 30,2008 <br /> 4.0 DUAL PHASE EXTRACTION TEST <br /> Soil vapor extraction and groundwater extraction are two proven technologies for the <br /> remediation of gasoline impacted sites. Dual phase extraction involves the use of high <br /> vacuurn_technology to simultaneously extract groundwater and soil vapor from one well. By <br /> r' <br /> inducing a cone of depression-by-extracting groundwater, additional- vadose zone soil is <br /> exposed to vapor extraction. For the Purpose of-this—pilot test, GTI,proposes to,utilize V a� <br /> mobile -treatment unit-for a-period•-of tvGo weeks? Extracted vapors will .be treated-with a> <br /> thermal oxidizer and groundwater wilfbe stored in a trailer.and hauled off site-for=disposal. <Y4 <br /> -_. .t c _ - - . _ -- <br /> GTI-will attempt to minimize groundwater extraction(except in MW-5) and apply the full <br /> vacuum to the vadose zone. <br /> Groundwater samples (influent to the knock out tank) will be collected forestimating .the, <br /> ,,,contaminant-..mass`-removal, Groundwater samples;will be analyzed for the following <br /> compounds: :-- .. -} <br /> • TPH-Dg <br /> _usin EPA Method 8015M <br /> - _ _ <br /> • TPH-G using EPA Method 8260 <br /> • BTEX using EPA Method 8260 <br /> r `-F <br /> Vapor samples are-also Collce ted-for'estimating the contaminant mass removal in vapor ��� <br /> phase. Vapor samples are analyzed for the following_compounds: Z <br /> • TPH-D,using EPA Method 80 SM"samples will be collecteAdn charcoal tubes-i 0"�7 2 <br /> • TPH G using EPA Method TO-3, samples will be collected in,/Soma 1 anister <br /> • BTEX•using EPA Method TO-3 samples will be collected infSoma anister <br /> ' Over the course of this tvyo.week.dual phase_pilottest at least,,6 groundwater.samples-and�G'� <br /> vapor samples will be collected. <br /> 4.1 Extraction Wells <br /> The existing monitoring we110_(M-W---5)' and new -b_ioventing wells (EW-1 and EW-101) <br /> installed for_previous pilot test(November-December 2007) will be utilized <br /> 4.2 Dual Phase Extraction System <br /> The general process for dual phase extraction is as follows: <br /> ■ Extract vapors and water using a liquid ring vacuum pump. <br /> ■ Separate the influent vapors and water in a portable vacuum tank. <br /> ■ The contaminated vapor is then oxidized in a thermal oxidizer. <br /> ■ The captured contaminated groundwater is transferred to a tanker truck trailer via a high <br /> vacuum pump. The tank trailer will be emptied at regular intervals by a licensed hauler <br /> for transportation to a waste disposal facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.