My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 11:24:52 AM
Creation date
3/9/2020 9:59:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological Technia Inc. 'NNW Page 8 <br /> ftw, Additional Pilot Test Work Plan <br /> Project No.770.2 <br /> October 30,2008 <br /> r. <br /> ■ Collect data for actual vacuum flow and contaminant concentrations and temperature. <br /> ■ Delineate the area of influence from the applied vacuum and groundwater draw down <br /> through use of observation wells. ? 1 <br /> 4.3 Equipment <br /> r <br /> ■ A self contained trailer—mounted unit will be procured with liquid ring blower, water <br /> transfer tank, thermal oxidizer and control panel. <br /> r. ■ A temporary propane tank will be used as fuel for the thermal oxidizer unit. <br /> ■ Hoses will be used to connect the well heads to a manifold on the trailer input pipe. <br /> ■ A 4000-gallon tank trailer will be used to hold the extracted water and then it will be <br /> hauled off at periodic intervals to a licensed disposal facility. <br /> 4.4 Phased Dual Phase Extraction Tests <br /> The first test will start with extraction from well MW-5 which is the most heavily impacted <br /> well. GTI will attempt to minimize groundwater extraction and maximize extraction <br /> efficiency with vacuum influence measured in adjacent monitoring wells screened across the <br /> water table (MW-4 and MW-7) in new wells pairs IW-1/101, EW-1/101, EW-2/102 and EW- <br /> 3/103. The test will continue for 5 days and 3 groundwater and 3 air samples will be <br /> collected for the analyses mentioned in Section 6.0. Vacuum, OVM, and groundwater depth <br /> will be measured a minimum of 10 times in the above mentioned wells over the course of the <br /> 5 day test. The system is turned off for 9 days to get back to the initial conditions before <br /> `r starting the second test. <br /> ..� A second test will then be conducted by extracting from shallow vadose zone well EW-1 <br /> (installed for bioventing) with vacuum influence measured in deep vadose zone wells EW- <br /> 101, EW-102 and EW-103 and the adjacent monitoring wells MW-4, MW-5 and MW-7. The <br /> test will continue for 5 days and 3 groundwate samples, if-An and 3 air samples will be <br /> collected for the analyses mentioned in Section 9.0. Vacuum, OVM, and groundwater depth <br /> will again be measured a minimum of 10 times in the above mentioned wells over the course <br /> �., of the 5 day test. The system is turned off for 9 days to get back to the initial conditions <br /> before starting the third test. <br /> •r A third test will then be conducted by extracting from deep vadose zone well EW-101 <br /> (installed for bioventing) with vacuum influence measured in shallow vadose zone wells EW- <br /> 1, EW-2 and EW-3 and the adjacent monitoring wells MW-4, MW-5 and MW-7. The test <br /> will continue for 5 days and 3 gro.ngwater and 3 air samples will be collected for the <br /> analyses mentioned in the Section . Vacuum, OVM, and groundwater depth will be <br /> measured a minimum of 10 times in the above mentioned wells over the course of the 5-day <br /> test. <br /> low <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.