Laserfiche WebLink
California Stop Page 2 of 2 <br /> 2224 Manthey Road May 10, 2013 <br /> Stockton, California 95206 <br /> • Perform a baseline monitoring event, prior to performing an in-situ ozone sparge (IOS) <br /> pilot test, that includes taking depth-to-water measurements at each monitoring well, <br /> and measuring geochemical parameters: pH, dissolved oxygen (DO), oxygen reduction <br /> potential (ORP), salinity, total dissolved solids (TDS) and specific conductivity (SC) in <br /> groundwater from monitoring wells MW-1, MW-2, MW-3, MW-5, MW-7 and MW-10; <br /> • Install a Mako Industries ozone sparging system and complete a twenty-four-week pilot <br /> study, injecting a maximum of three pounds per day of ozone simultaneously into <br /> previously installed ozone injection wells OZ-1 and OZ-2; <br /> • Monitor the ozone injection rate and frequencies weekly; <br /> • Perform one groundwater monitoring event following the first month of operating the <br /> IOS system, and during the third and sixth month of operating the IOS system; during <br /> each monitoring event, depth-to-water will be measured at each monitoring well, and <br /> groundwater samples and geometric parameters: pH, DO, ORP, salinity, TDS, and SC <br /> will be collected from MW-1 through MW-3 and MW-7; <br /> • Collect groundwater from the above-listed monitoring wells and analyze the samples <br /> for: TPH-g, BTEX, anions and metals listed in the work plan, hexavalent chromium, pH, <br /> conductivity, chemical oxygen demand, ammonia, alkalinity, TDS, dissolved iron and <br /> dissolved manganese; and <br /> • Submit a report of findings following the first month of operating the IOS and SVE <br /> systems. <br /> The EHD approves the work plan contingent upon your obtaining concurrence from the <br /> California Regional Water Quality Control Board, Central Valley Region (CRWQCBCVR) to <br /> proceed with the ozone feasibility pilot study. You must also get approval from the <br /> CRWQCBCVR of Notice of Intent to comply with the terms of General Waste Discharge <br /> Requirements, and the Monitoring and Reporting Program No. R5-2008-0149-010. <br /> Also, when collecting vapor samples in Tedlar bags from the influent and effluent sampling <br /> ports, store the Tedlar bags at room temperature instead of placing the Tedlar bags "in a chilled <br /> container under ice." <br /> On 10 May 2013, the EHD posted public notification of pending approval by this department of <br /> the Remedial Action Work Plan to implement remediation at this site. The public has 30 days to <br /> express concern regarding the pending remediation at this site. If none is received, fieldwork <br /> may commence on 10 June 2013. <br /> Please contact Vicki McCartney at (209) 468-9852 or by email at vmccartney ansjcehd com if <br /> you have any questions concerning this letter. <br /> Sincerely, <br /> Victoria L. McCartney, REHS Nuel C. Henderson, Jr., PG <br /> Senior Registered Environmental Health Specialist Engineering Geologist <br /> c: Mr. Timothy J. Cuellar, Advanced Geo Environmental, Inc., 837 Shaw Road, Stockton, <br /> California 95215 <br /> Mr. James L.L. Barton, PG, California Regional Water Quality Control Board Central <br /> Valley Region, 11020 Sun Center Drive, Suite 200, Rancho Cordova, California 95670 <br />