My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2900 - Site Mitigation Program
>
PR0541650
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 4:05:38 PM
Creation date
3/11/2020 2:35:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541650
PE
2960
FACILITY_ID
FA0023868
FACILITY_NAME
FORMER USA GASOLINE SERVICE STATION 110
STREET_NUMBER
2132
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
1730635
CURRENT_STATUS
01
SITE_LOCATION
2132 E MARIPOSA RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> 9. Photographs of each site and surrounding area will be <br /> taken for inclusion in the final report. <br /> C. Well Development. <br /> 1 . Wells will be developed by bailing under the supervision <br /> of a Pacific hydrogeologist. <br /> 2. Due care shall be exercised to ensure that the slotted <br /> section is not damaged during development. <br /> 3. Due care shall be exercised to ensure that contaminants <br /> are not introduced to the well during development. <br /> 4. Development of each well shall continue until the well <br /> is essentially sediment free. <br /> D. Contaminated soil and/or water disposal . <br /> 1 . Any contaminated soil or water brought to the surface <br /> will be put into 55 gallon drums and marked as follows: <br /> Hazardous Waste <br /> U.S.A. Petroleum Corp. <br /> Attn: Johan Hanson <br /> (213) 435 9147 <br /> 2. Disposal of contaminated materials will be handled by <br /> U.S.A. Petroleum Corp. <br /> III . Data Acquisition <br /> A. Top of pipe elevations shall be determined to the nearest <br /> 0.01 feet. <br /> B. Total well depth shall be determined to the nearest 0. 1 feet. <br /> IV. Data Evaluation and Write-up <br /> A. Site specific data will be submitted to Pacific Environment <br /> Group for inclusion in hydrogeological report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.