My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
10100
>
2800 - Aboveground Petroleum Storage Program
>
PR0515795
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 2:36:27 PM
Creation date
3/16/2020 10:01:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515795
PE
2832
FACILITY_ID
FA0004382
FACILITY_NAME
NORTHWEST PIPE COMPANY
STREET_NUMBER
10100
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
25312041
CURRENT_STATUS
01
SITE_LOCATION
10100 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑� Northwest Pipe Spill Prevention, Control, and Countermeasure (SPCC) Plan 4 <br /> �--. Company Tracy Plant <br /> 2.2 Professional Engineer (PE) Certification <br /> The undersigned registered Professional Engineer (PE) is familiar with the <br /> requirements of 40 CFR § 112 and APSA, has visited and examined this facility, or <br /> supervised examination of the facility by personnel qualified appropriately. The <br /> undersigned registered PE attests: <br /> 1) This SPCC Plan has been prepared in accordance with good engineering <br /> practice, including consideration of applicable industry standards and the <br /> requirements of 40 CFR § 112 and APSA; <br /> 2) Procedures for required inspections and testing have been established; and <br /> 3) This Plan is adequate for this specific facility. <br /> This certification in no way relieves the owner or operator of the facility of his/ her duty <br /> to implement fully this SPCC Plan in accordance with the requirements of 40 CFR § <br /> 112 and APSA. This Plan is valid only to the extent the facility owner or operator <br /> maintains, tests, and inspects equipment, containment, and other devices as <br /> prescribed in this Plan. <br /> Certifying Professional Engineer: <br /> Alejandro J. Alatorre, PE, QSD <br /> President—Alatorre Engineering Solutions, Inc. <br /> Registered Professional Engineer— Registration #C32761 <br /> pROF,ft <br /> Z <br /> m � <br /> A. <br /> a <br /> 5 <br /> � a ML P <br /> CALIVO <br /> 05-21-2020 <br /> Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.