Laserfiche WebLink
❑� Northwest Pipe Spill Prevention, Control, and Countermeasure (SPCC) Plan 4 <br /> �--. Company Tracy Plant <br /> 2.2 Professional Engineer (PE) Certification <br /> The undersigned registered Professional Engineer (PE) is familiar with the <br /> requirements of 40 CFR § 112 and APSA, has visited and examined this facility, or <br /> supervised examination of the facility by personnel qualified appropriately. The <br /> undersigned registered PE attests: <br /> 1) This SPCC Plan has been prepared in accordance with good engineering <br /> practice, including consideration of applicable industry standards and the <br /> requirements of 40 CFR § 112 and APSA; <br /> 2) Procedures for required inspections and testing have been established; and <br /> 3) This Plan is adequate for this specific facility. <br /> This certification in no way relieves the owner or operator of the facility of his/ her duty <br /> to implement fully this SPCC Plan in accordance with the requirements of 40 CFR § <br /> 112 and APSA. This Plan is valid only to the extent the facility owner or operator <br /> maintains, tests, and inspects equipment, containment, and other devices as <br /> prescribed in this Plan. <br /> Certifying Professional Engineer: <br /> Alejandro J. Alatorre, PE, QSD <br /> President—Alatorre Engineering Solutions, Inc. <br /> Registered Professional Engineer— Registration #C32761 <br /> pROF,ft <br /> Z <br /> m � <br /> A. <br /> a <br /> 5 <br /> � a ML P <br /> CALIVO <br /> 05-21-2020 <br /> Date <br />