Laserfiche WebLink
62 Periodic Hazards Assessment <br /> At the beginning of each project shaft, and as often as necessary to ensure safety, a <br /> qualified supervisor shall conduct an area survey to locate workplace hazards and assess <br />' appropriate control measures The Project Safety Officer shallP Y inspect ect the whole <br /> P <br /> of the project site at least weekly to evaluate observable hazards that may be present and to <br /> take action to control them The results of the Project Safety Officer's observations shall be <br /> documented All health and safety actions taken on the project site as the result of the <br /> findings of any routine or special review, or in response to any accident or unanticipated <br /> hazardous condition, shall also be documented in a record maintained on the project site and <br /> forwarded to MARK's central project files when the project is complete <br /> 63 Monitoring Records <br /> Data from programs designed to monitor air, soil, water, and waste streams, in <br /> addition to daily work records, are to be entered into permanent log books When complete, <br /> all logs are to be forwarded to MARK central project files <br /> 6-2 REV 4/92-EGI <br /> 111 re <br />