Laserfiche WebLink
SA NJ O A Q U IN Environmental Health Department <br /> COU NTY--- <br /> 6. Provide enclosed light fixtures, or shatterproof shields for light fixtures, over all areas <br /> where food is prepared, utensils cleaned, or open food is stored [CRFC §114252.1]. <br /> 7. Hot water shall be supplied at a minimum temperature of at least 120°F measured from <br /> the faucet. The water heater shall have a minimum rating of 36,000 BTUs or 8 KW. <br /> [CRFC §114192]. <br /> 8. All ice machines and bins, food preparation sinks, warewashing sinks (dishwashing <br /> units), display cases and refrigeration units, and any other food service equipment <br /> which discharges liquid waste, shall be drained by means of indirect waste pipes <br /> discharged through an air gap into a floor sink or other approved waste receptor. All <br /> floor sinks are to be positioned to be readily cleanable, accessible for inspections, and <br /> must be flush with finished floor. Do not place floor sinks inside walk in refrigeration <br /> units or cabinets [CRFC §114193 and §114193.1]. <br /> The EHD must be kept informed of the construction progress. A final inspection must be <br /> performed, operating permit fees paid, and approval to operate granted prior to opening for <br /> business. All equipment must be installed and thorough cleaning completed prior to the final <br /> inspection. Inspections must be scheduled at least 48 hours in advance. Charges for additional <br /> inspections, re-inspections and/or consultations may be assessed at the EHD hourly rate of $ <br /> 152 per hour. <br /> Any item(s) inadvertently overlooked in the plan check process, which is not in compliance <br /> with applicable State laws, and/or city or county ordinance codes, shall be constructed or <br /> reconstructed upon request of the EHD. Inferior workmanship, equipment, or materials will not <br /> be accepted for the construction or operation of a food facility. Any variance from the <br /> requirements outlined in this letter will require written approval from the EHD. Approval of the <br /> submitted plans shall become null and void if the work authorized is not commenced within 180 <br /> days from the date of approval, or the work authorized by such plans is abandoned. In order to <br /> renew action on an expired plan approval, the applicant shall submit fees equal to that of a new <br /> plan review. A copy of the approved plans shall be available on site at the time of final <br /> inspection. <br /> If you have any questions, please contact Victor Acevedo, Environmental Health <br /> Specialist, at (209) 209-468-0337. <br /> Sincerely, <br /> Jeff Carruesco, REHS, RDI <br /> Program Coordinator <br /> 2 of 2 <br />