Laserfiche WebLink
r <br /> STEVE SHINNERS <br /> Page 3 <br /> 4) Additional copies of the proposed CAP, as well as an Executive <br /> Summary, will be made available to the public for inspection and <br /> review during the public notification period. <br /> 5) If there is sufficient public interest or concern on the proposed <br /> CAP, a public meeting may be held. <br /> 6) The schedule, format and procedure for concurrence on the CAP <br /> is to be established by PHS/EHD. One or more documents may <br /> be needed to meet all the requirements for the CAP. <br /> The PAR shall be submitted to PHS-EHD and the Central Valley Regional Water <br /> Quality Control Board (CVRWQCB) within 90 days following the conclusion of the site <br /> characterization, but not later than March 31, 1995. <br /> If you have any questions, please contact me at (209) 468-3452. <br /> Donna Heran, REHS, Director <br /> nvironmental Health Division <br /> Diane M. Hinson, REHS, Supervisor <br /> Site Mitigation Unit <br /> cc: William Loskutoff <br /> Woodward-Clyde Consultants <br /> Elizabeth Thayer <br /> CVRWQCB <br /> Ross Nelson <br /> Kelleher Environmental, Inc. <br /> i <br /> ti <br />