Laserfiche WebLink
California Renal Water Quality C&trol Board <br /> Central Valley Region <br /> Steven T.Butler, Chair <br /> inston H.Hickoz Gray Davis <br /> Secretary for Sacramento Main Office Governor <br /> Environmental Intemet Address: hap://w .swcb.ca.gov/—mgcb5 <br /> Protection 3433 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> 29 November 2000 <br /> Ms. Jill Jefferson <br /> Kinder Morgan Energy Partners, L.P. <br /> 1100 Town and Country Road <br /> Orange, CA 92868 <br /> WORK PLAN APPROVAL, KINDER MORGAN ENERGY PARTNERS STOCKTON <br /> TERMINAL, 2947 NAVY DRIVE, STOCKTON, SAN JOAQUIN COUNTY <br /> We have reviewed the 17 November 2000 Work Plan to Conduct Downgradient Assessment of <br /> Petroleum-Affected Groundwater submitted by LFR Levine-Fricke (LFR) for the Kinder Morgan Energy <br /> Partners (KMEP) Stockton Terminal. The work plan reflects the agreements reached during a telephone <br /> conference call on 30 October 2000 between KMEP, LFR, and Board staff. The work plan proposes to <br /> install a well cluster a monitoring well (MV) cluster downgradient of boring GP-9. The work plan is <br /> hereby approved. <br /> As stated in our 13 October 2000 letter, K1VlEP needs to confirm the elevated levels of constituents of <br /> concern (COCl) detected in grab groundwater samples at GP-6 and GP-7. As discussed during our <br /> conference call, installation of MWs at these locations at this time might be premature because <br /> excavation could be the chosen alternative to clean up soil. Excavation at these locations would require <br /> decommissioning of the MWs, resulting in wasted time and resources. Regardless of the remedial <br /> alternative to clean up soil and groundwater, MWs eventually will have to be installed at or in the <br /> vicinity of GP-6 and GP-7 to confirm the elevated levels of CDCs. <br /> Based on our 22 November 2000 telephone conversation with Mr. Scott Armstrong of LFR, please <br /> submit a report on the MW cluster installation near GP-9 by 1 March 2001. <br /> If you have any questions, you may call me at (916) 255-3081 or e-mail at isorenp@rb5s.swrcb.ca.gov. <br /> PK1L P 9. ISORENA <br /> Associate Engineer <br /> (cc on next page) <br /> California Environmental Protection Agency <br /> p,�d Recycled Paper <br />