My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5110
>
2900 - Site Mitigation Program
>
PR0505897
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 2:08:04 PM
Creation date
3/31/2020 2:02:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0505897
PE
2950
FACILITY_ID
FA0007071
FACILITY_NAME
SEARS ROEBUCK & COMPANY
STREET_NUMBER
5110
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
02
SITE_LOCATION
5110 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E1 <br /> ,16+'10 '' 95 )ION 11:09 FAX 1510t8d4,9968 ER;!►PEST WC Zoos <br /> APR equipped with organic vapor/HEPA .filter cartridges in lieu of half- <br /> face APR and safety glasses. <br /> Sustained PID readings over 50 ppm requires activities to cease, and <br /> personnel are to evacuate the exclusion zone. If questions arise, address <br /> them to the Site Safety Officer. <br /> 8. Safety Procedures: <br /> Procedures must be followed to ensure suitable site control so that persons <br /> who may be unaware of site conditions are not unnecessarily exposed to <br /> hazards. The work area will be barricaded by tape, warning signs, or flags. <br /> Any equipment or machinery will be secured and stored safely. <br /> 4 <br /> Site Entry/Access-Access inside the specified work area will be limited to <br /> authorized personnel. Only ERM employees and designated ERM <br /> subcontracted personnel, as well as designated employees of the Client, <br /> will be admitted to the work site. Only those workers possessing evidence <br /> of the required current 40-hour OSHA health and safety Training or <br /> current 8-hour refresher will be permitted in the designated exclusion <br /> zone. The Site Safety Officer will be responsible to ensure workers wear <br /> proper personal protective clothing. All personnel entering the site will <br /> sign the signature document at the end of this HSP, indicating they have <br /> read and accepted the health and safety practices outlined in this plan. <br /> A PID will be used to analyze total organic compound concentrations <br /> every 30 minutes in the worker's-breathing zones while workers are in the <br /> exclusion zone. The PID will be calibrated daily and results of the <br /> calibration recorded on ERM's Equipment Calibration Record. The results <br /> of the monitoring levels will be recorded on an ERM Air Monitoring <br /> Form. <br /> All personnel entering the site will exit at the same location. If <br /> decontamination is necessary exiting the site will include following <br /> decontamination procedures. There must be an alternate exit established <br /> for emergency situations. The em&gency exit is to be used for <br /> emergencies only- <br /> Despite protective procedures personnel may come in contact with <br /> potentially hazardous compounds while performing work tasks. If so, <br /> decontamination needs to take place. Standard decontamination <br /> procedures for level C and D are as follows: <br /> • Equipment drop; <br /> • Boot covet' and glove wash; <br />
The URL can be used to link to this page
Your browser does not support the video tag.