Laserfiche WebLink
i • <br /> CLEANUP AND ABATEMENT ORDER -7- <br /> LINCOLN PROPERTIES, LIMITED <br /> LINCOLN VILLAGE SHOPPING CENTER <br /> SAN JOAQUIN COUNTY <br /> INTERIM REMEDIAL MEASURES (cont.) FINAL REMEDIAL MEASURES (cont.) <br /> 7a Within 30 days of Board approval 9b Within 14 days of the Board's ap- <br /> of the IRM Alternative Analysis proval of the Phase IV Work Plan, <br /> Report, but in any event no later but in any event no later than 15 <br /> than 4 September 1992, submit for February 1993, begin conducting the <br /> Board approval a draft 10 percent investigation. <br /> design of the approved IRM(s). <br /> Lincoln shall base the draft de- 10b Within 120 days of Board approval <br /> sign on available soil and ground of the Phase IV Work Plan, but in <br /> water data. The design shall spe- any event no later than 25 June <br /> cify, but not be limited to, the 1993, submit for Board approval a <br /> ground water treatment system, report compiling and interpreting <br /> proposed ground water extraction the results of Phase IV of the site <br /> well locations and depths, investigation (Phase IV Report). <br /> screened intervals, construction Within 30 days of Board comments on <br /> details, pumping rates and pre- the report, but in any event no <br /> dicted radii of influence. All later than 25 July 1993, submit for <br /> soil and ground water analytical Board approval a Final Phase IV <br /> data, pumping test analytical pro- Report responding to the Board' s <br /> cedures and results, and any other comments. The final investigation <br /> data used to develop the design, report (Phase III or Phase IV) <br /> shall be appended to the draft shall be named the Final Remedial <br /> design. The draft design shall Investigation (RI) Report. <br /> address the Board's comments and <br /> comply with the Board's recommen- llb Within 60 days of Board approval of <br /> dations on the IRM Work Plan. the Final RI Report, submit for <br /> Board approval a Feasibility Study <br /> (FS) evaluating the economic and <br /> 8a Within 60 days of Board approval technical feasibility of cleanup <br /> of the 10 percent design, but in alternatives for the contaminated <br /> any event no later than 4 December soil and ground water defined in <br /> 1992, submit for Board approval the Final RI Report. <br /> (1) the 100 percent IRM design and <br /> (2) the Report of Waste Discharge The FS shall recommend one or a <br /> for Waste Discharge Requirements combination of cleanup remedies and <br /> governing land disposal of the remedial action objectives. The <br /> treated ground water or an NPDES recommended alternative shall be <br /> Permit Application for a permit to consistent with the IRM. <br /> discharge the treated ground water <br /> to surface waters. The FS shall include the final Risk <br /> Assessment. <br /> 9a Within 30 days of Board approval <br /> of the 100 percent IRM Design, but <br /> in any event no later than 5 Febr- <br /> uary 1993, submit for Board ap <br />