Levine-Fricke-Recon
<br /> ENGINEERS,HVDROGEOLOGISTS 8 APPLIED SCIENTISTS
<br /> Documents Submitted or Received
<br /> The following documents were completed and issued during the bimonthly period:
<br /> • The "Quarterly Groundwater Monitoring Report, October 1 through December 31, 1997
<br /> (Fourth Quarter 1997), Lincoln Center, Stockton, California," dated February 13, 1998.
<br /> • The "Draft Work Request for Department of Toxic Substances Control Oversight and Review
<br /> of Ecological and Human Health Risk Assessment, Lincoln Center, Stockton, California," was
<br /> sent to the DTSC on February 27, 1998.
<br /> • The "Draft Interim Source Area Remedial Investigation Report, Lincoln Center, Stockton,
<br /> California," was submitted to the RWQCB for review and approval on February 27, 1998.
<br /> • The "Phase I Interim Remedial Action Detailed Plan, Lincoln Center, Stockton, California,"
<br /> dated February 27, 1998, was submitted to the Court for its review and approval. The Court
<br /> issued an Agreed Order approving the same document on March 2, 1998.
<br /> • Advance public notification was provided on March 9, 1998, to residents located in the
<br /> immediate vicinity of Locations 1, 5, 9, and 11 for the proposed CPT/PIPP plume perimeter
<br /> investigation conducted in the neighborhoods upgradient and downgradient of Lincoln Center
<br /> (see Figure 1 for locations).
<br /> Fact Sheet No. 3 was issued to all parties and residents in the vicinity of Lincoln Center on
<br /> March 17, 1998. Fact Sheet No. 3 described findings of the RI and upcoming RI and IRA field
<br /> activities as well as an announcement of the Lincoln Center Community Meeting.
<br /> • A Public Notice of the Lincoln Center Public Meeting held on March 31, 1998, was published
<br /> in The Record from March 17 through 31, 1998.
<br /> Permit applications for field activities, including the Plume Perimeter Investigation and the
<br /> Phase I IRA extraction well and piezometer installation, were submitted to the San Joaquin
<br /> County Public Health Services, Environmental Health Division; San Joaquin County
<br /> Department of Public Works; and City of Stockton Department of Public Works.
<br /> The following documents were received during the bimonthly period:
<br /> The RWQCB approved the "Phase I Interim Remedial Action Detailed Plan, Lincoln Center,
<br /> Stockton, California," on February 11, 1998. The Court issued an Agreed Order approving
<br /> this document on March 2, 1998.
<br /> • The RWQCB approved the "Proposed Additional CPT and Groundwater Monitoring Well
<br /> Locations, Plume Perimeter Investigation, Lincoln Center, Stockton, California," dated
<br /> January 30, 1998, on March 3, 1998.
<br /> bimonthly-Apn198-041I I:SRL 3
<br />
|