My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:51 PM
Creation date
3/31/2020 2:34:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1998-2000
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Levine-Fricke-Recon <br /> ENGINEERS,HYDROGEOLOGISTS&APPLIED SCIENTISTS <br /> Field Activities <br /> Two field activities are to be conducted as part of the Phase I IRA installation on the Subject <br /> Property. The first activity will be the installation of two groundwater extraction wells at the <br /> locations as shown in Figure 1. The second activity will occur in between the two well installations <br /> and will consist of the installation of underground conveyance piping and electrical service conduits <br /> in trenches as shown in Figure 1. Installation of service vaults for the two extraction wells will <br /> occur after the wells are installed. Installation of electrical service and controls within the vaults and <br /> the connecting conduits will occur at night during a separate phase of field construction following <br /> completion of Chevron's current remodeling. <br /> As discussed with Mr. Garrett and Chevron's contractor, after LFR's installation work is <br /> completed, LFR will backfill the trenches to a height just below the current pavement surface. The <br /> trenches will then be repaved by Chevron's contractor as part of the asphalt pavement overlayment <br /> work. <br /> Before field activities are conducted on the Subject Property, any buried utilities that are present in <br /> the parking lot in the vicinity of the trench alignment and the extraction well locations will be <br /> located and marked on the asphalt to prevent any contact with utilities during drilling or trenching. <br /> Field Equipment <br /> Field equipment for the extraction well installation will consist of a mud-rotary drilling rig, shaker <br /> trailer, and support vehicles. The work space at each location will be approximately 30 feet by 60 <br /> feet, covering an area of approximately 1,800 square feet. The work space will be cordoned off <br /> during the drilling period to prohibit access by unauthorized personnel. Field equipment for the <br /> trenching work will likely be limited to a rubber-tired backhoe and a small dump truck. Support <br /> vehicles will be moved off the Subject Property at the end of each work shift. Representatives of <br /> Lincoln Properties, Ltd. may also be in attendance to oversee field activities. <br /> Field Personnel <br /> Mr. Donald T. Bradshaw, R.G., Site Project Manager, oversees all aspects of the construction at <br /> the Lincoln Center site and can be contacted at (510) 596-9559. Mr. Alger, Senior Engineering <br /> Geologist, is responsible for supervising the field personnel conducting Phase I IRA tasks and can <br /> be contacted at (510) 596-9683. <br /> Schedule <br /> As discussed with Mr. Garrett during the site meeting held on Friday, February 20, 1998, the <br /> schedule for these field activities is somewhat dependent on weather conditions and progress made <br /> by Chevron's remodeling contractor. We have tentatively scheduled drilling of the first and second <br /> extraction wells beginning on March 1 I and March 20, 1998, respectively. Trenching is tentatively <br /> Ur-Access-Chevron-trewhes-04111:SRL 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.