LFR Inc. <br /> Estimated Cost for Implementation of the Phase V Interim Remedial Action <br /> Item/Description Item Costs Total Cost <br /> DIRECT CAPITAL COSTS <br /> Preliminary Costs $ 40,000 <br /> Well Installation $ 180,000 <br /> ERD Substrate $ 200,000 <br /> Substrate Injection $ 50,000 <br /> Injection Equipment Costs $ 10,000 <br /> $ 480,000 <br /> INDIRECT CAPITAL COSTS <br /> Project Management $ 30,000 <br /> Permitting Fees $ 10,000 <br /> Performance Monitoring and Reporting (per $ 50,000 <br /> year) <br /> Contingencies $ 50,000 <br /> $ 140,000 <br /> TOTAL $ 620,000 <br /> 5.0 IMPLEMENTATION PLAN AND SCHEDULE FOR THE PHASE V IRA <br /> A schedule for implementation of the Phase V IRA is presented on Figure 9. This <br /> section presents a discussion of the individual elements on this schedule, which must be <br /> performed to complete the Phase V IRA. <br /> 5.1 Overview and Schedule <br /> As discussed in Section 1.2, implementation of the proposed Phase V IRA will consist <br /> of installation of 22 substrate injection and six groundwater monitoring wells, injecting <br /> approximately 15,000 gallons of food-grade emulsified oil, and implementing a <br /> comprehensive groundwater monitoring program. <br /> Pursuant to Section XI.A.4 of the Amended First Final Consent Decree, the Settling <br /> Parties and the Public Agencies (as defined in the Amended First Final Consent <br /> Decree) will have 45 days in which to object to the Proposed Phase V IRA Detailed <br /> Plan, unless an order shortening the time frame is obtained from the Court. If no <br /> objections to the Phase V IRA Detailed Plan remain at the conclusion of the 45-day <br /> wp-PhV IRA-Sep07-Fimi-06750.dm:Ifr Page 29 <br />