Laserfiche WebLink
Mr. Larry Higinbotham <br /> Thrifty Station#172 <br /> Page 2 of 2 <br /> Vapor well VW-2-S/VW-2-D is not proposed to be replaced. The EHD will approve this at this time, <br /> but if conditions in the future indicate that additional vapor extraction is needed in this area, the vapor <br /> well must be replaced. <br /> The removal of potentially petroleum impacted soil in the UST pit(over-excavation) is a corrective <br /> action. This corrective action is tentatively approved as adequate and necessary. [H&S Code <br /> 25296.1 0(c)(3). Final approval can only be given after the public has been notified and allowed to <br /> comment. (California UST Code section 2728). The notification process requires additional paper <br /> work to be submitted to the EHD for review and approval. <br /> An executive summary is required. This document should be written in a language easily <br /> understandable by the general public, is to be on a one-page, non-letterhead paper and should <br /> provide the public a quick over view of what it is you want to do at the site, why you want to do it, what <br /> effects the public may be expected to be exposed to, how long it will take, and what the site will be <br /> when you are done with the procedure. This document is required and is to be submitted to the EHD <br /> immediately if you wish to meet the schedule you included in the Plan. <br /> After the EHD reviews the executive summary, you will be notified if it is approved. Once approved, <br /> the site will be posted and the public in the immediate area will be notified of the corrective action <br /> proposal. A short comment period will be provided for the public to comment. You will be notified of <br /> the outcome after the comment period has ended. If no significant objections are received at the EHD, <br /> the tentatively approved corrective action will be approved for enactment. <br /> Thank you for your continued cooperation and response to the EHD requirements. You may contact <br /> Michael Infurna at(209)468-3454 or by electronic mail at minfuma(a-slcehd.com should you wish to <br /> discuss the site. <br /> Donna Heran, REHS, Director <br /> Environmental Health Department <br /> Michael J. Infurna Jr., Senior REHS Zare'tLrgoriojREHOS <br /> LOP/Site Mitigation Unit IV Program Coordinator, Unit IV <br /> MI/ <br /> cc: CVRWQCB—James Barton, Sacramento <br /> SWRCB-Clean Up Fund—Mark Owens, Sacramento <br /> GeoHydrologic Consultants, Inc. —Richard Vogel, 5912 Bolsa Avenue Suite 200, <br /> Huntington Beach CA 92649 <br />