My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2900 - Site Mitigation Program
>
PR0515353
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/1/2020 2:23:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0515353
PE
2950
FACILITY_ID
FA0012099
FACILITY_NAME
ARCO STATION #595
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
project's construction plans-In their possession. Please coact Ken <br /> for particulars. <br /> The existing well is at the northeast corner of the property, see photo <br /> ORG-102604-05-PF. The area consists of a fenced in area containing the <br /> well, a filter and several pumps. Alongside (west) of the well are <br /> three above ground water holding tanks. This facility is within the <br /> reconstructed bridge ramp and must be relocated. The driveway in the <br /> foreground of the photo is designated driveway (DWY) No. 19. <br /> Significant change (up) in elevation of this driveway is necessary for <br /> the road reconstruction. <br /> The proposed location of the new well is at the southeast corner of the <br /> property, see photos ORG-102604-06-PF and ORG-102604-07-PF. The <br /> driveway in the photos is designated DWY No. 18. It also will be <br /> reconstructeded by a grade change up of from one to two feet, <br /> transversely as the reconstructed road grades up toward the bridge. The <br /> proposed location of the new well (25' from both the east and south <br /> property lines) would place the well very near the driveway and existing <br /> parking spaces which may have to be re-worked. Between DWY's No. 18 & <br /> 19 a new retaining wall will be constructed, in front of the main <br /> building. <br /> Renovation of the main building is underway at this property. No person <br /> with information on the relocation of the well was present during my <br /> inspection. No work on the existing nor new well site was apparent. <br /> Other than the new information provided in this memo, my additional <br /> comments remain the same as my previous memo (ARCO) . <br /> Martin P. (Pat) Flatley, P.E. <br /> Supervising Bridge Construction Engineer <br /> Project Structures Representative <br /> Parsons Brinckerhoff Construction. Services <br /> Cell Phone (925) 382-4507 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.