My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
6349
>
2900 - Site Mitigation Program
>
PR0505312
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 3:36:37 PM
Creation date
4/1/2020 3:32:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505312
PE
2950
FACILITY_ID
FA0006699
FACILITY_NAME
D V VINEYARDS
STREET_NUMBER
6349
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
6349 E PINE ST 5
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Performing field audits, when necessary, to monitor the <br /> effectiveness of the HSP and to ensure compliance with it. <br /> • Conducting or directing personal exposure monitoring where <br /> required and where deemed necessary to determine the adequacy <br /> of protective measures and PPE specified by this HSP. <br /> • Maintaining contact with the PM to regularly evaluate project <br /> conditions and new information which might require <br /> modification to this HSP. <br /> • Working with the PM to ensure that sufficient PPE is available at <br /> the site. <br /> • Conducting briefing meetings, when necessary, to apprise <br /> personnel of the contents of this HSP and the project hazards. <br /> 2.4 FIELD PERSONNEL <br /> All field and subcontractor personnel are responsible for following the <br /> health and safety procedures specified in this HSP and for performing <br /> their work in a safe and responsible manner. Specific requirements <br /> include: <br /> • Obtaining a copy of this HSP and reading it, in its entirety, prior to <br /> the start of field activities. <br /> • Signing the Health and Safety Sign off Sheet acknowledging <br /> receipt and understanding of this HSP. <br /> • Bringing forth any questions or concerns regarding the content of <br /> the HSP to the HSO, PM or DHS prior to the start of work. <br /> • Reporting accidents/incidents and the presence of potentially <br /> hazardous working situations to the HSO and PM. <br /> • Complying with the requests of the appointed HSO. <br /> 2-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.