Laserfiche WebLink
10%05/98 MON 11 50 FAX 925 363 7275 TERRA NAC NOR CAL [ J004 <br /> Subtask 3 4- Startup & Testing $ 9,800 <br /> One week of startup activities will include all safety shutdown testing, source testing for <br /> air permit compliance, with wells to be brought online sequentially as concentrations <br /> allow after completion of the source test ORC "socks"will be installed in wells MW-3 <br /> and MW-4 The CAP calls for laboiatory analysis of vapor samples from wells Terra <br /> Vac's inhouse laboratory cau be utilized for considerable savings over an outside, <br /> certified lab Othct than the vapor sairiplcs for the source test and air permit compliance <br /> (which also may be negotiable as we have found in other air districts), it is assumed that <br /> vapor samples foi TPH-g/BTEX will be analyzed inhouse <br /> Task 4- Operations and Maintenance $207,400 <br /> Subtask 4 1- Week 7-12 $ 30,790 <br /> It is assumed that the fiist 12 weeks will be SVE operations only, with no sparging The <br /> Retox i-mit can be monitored utilizing computer softwatei and modem in addition to <br /> weekly visit,, Weekly visits will include optimizing the system based on well opei ating <br /> pai ameters as well as maintaining equipment and periodic breathing zone monitoring <br /> Monthly inlet and exhaust samples will be collected and analyzed <br /> Subtask 4 2 - Weeks 13-52 $114,930 <br />• Air sparging will presumeably begin aftei 12 weeks of SVE operations This task <br /> includes a shoit startup peiiod where baseline groundwater and dissolved oxygen levels <br /> will be measured, and grab samples are collected for TPHg/BTEX at six onsite <br /> monitoring wells Dissolved oxygen will then be measured periodically after sparging <br /> has begun Monthly water samples from these six wells will be analyzed foi TPH- <br /> g/BTEX and MTBE by EPA 8015/8020 Additional costs for confirmation of MTBE by <br /> EPA 8240 has not been included Costs for quarterly groundwatei monitoring, sampling <br /> and reporting are not included <br /> ORC `socks" will be changed quarterly, weekly visits will continue but we assume that <br /> Hydrocarbon extraction rates will become asymptotic by the end of one year The criteria <br /> for vapor cleanup of 100 ppmv may result in longer operations that may be more cost <br /> effective with a tiansition to vapor phase carbon for vapor abatement <br /> Subtask 4 3 - Weeks 53-104 $ 61,680 <br /> Terra Vac believes that the second year of operation will be reduced to air injection foi <br /> enhanced biorernediation, with no further requirement of vapor abatement Monthly <br /> sampling of the six onsite monitoring wells will continue as weekly site visits are reduced <br /> to monthly <br />