Laserfiche WebLink
Kennedy/Jenks Consultants <br /> groundwater zones beneath the Facility will be calculated. This can be done by using the Darcy <br /> flux equation. The ultimate goal is to qualitatively evaluate a mass and groundwater flow <br /> balance for the Facility to determine if site discharge and LAA usage of process water can be <br /> accounted for in groundwater quality information. <br /> 2.8 Groundwater Characterization Work Plan Schedule <br /> The work outlined in the GWC Work Plan will be implemented according to the following <br /> schedule: <br /> • 21 June 2004— Submit Groundwater Characterization Work Plan <br /> • 16 July 2004— Prepare Health and Safety Plan and select a licensed drilling contractor <br /> • 31 August 2005—Complete CPT/HydropunchTM work <br /> 1 November 2005— Submit Groundwater Characterization Report to CRWQCB <br /> Groundwater Protection Work Plan, The Wine Group Page 2-7 <br /> Franzia Winery, Ripon, California <br /> 1E X 11,1,, -4 <br />