Laserfiche WebLink
Site Health&Safety Plan <br /> Cargill,Inc.,Port Road No.8 <br /> Stockton,California <br /> Sierra-Pacific Project No.95-128.02 <br /> L.i <br /> 3.0 PREPARATION FOR FIELD WORK <br /> The appropriate authorities, including State and local regulatory agencies, the property owner <br /> and the occupant of the roe if an shall be notified of the intended work prior to its <br /> P property n3' ( Y)� <br /> initiation. Permission and permits to perform the work shall be obtained as necessary. <br /> Advisement shall include notifying these parties of our intent to perform the field work with <br /> this site H&SP in place. <br /> USA will be contacted prior to initiating the work, and a private utility finder will be hired to <br /> examine proposed sample locations for buried structures and pipes. Sierra-Pacific will request <br /> Cargill management's assistance in identifying underground utilities. <br /> Areas for stockpiling soil boring cuttings and decontamination water will be selected at the site <br /> prior to the initiation of cleaning operations. Facility management will be advised of the <br /> Cstorage location in advance of the field work. <br /> L ' <br /> C <br /> Sierra-Pacific Groundwater Consultants, Inc. 3 <br />