My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2900 - Site Mitigation Program
>
PR0506101
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 1:46:27 PM
Creation date
4/3/2020 1:40:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506101
PE
2960
FACILITY_ID
FA0007202
FACILITY_NAME
CARGILL MOLASSES
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
PORT RD 8
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Health&Safety Plan <br /> Cargill,Inc.,Port Road No.8 <br /> Stockton,California <br /> Sierra-Pacific Project No.95-128.02 <br /> L.i <br /> 3.0 PREPARATION FOR FIELD WORK <br /> The appropriate authorities, including State and local regulatory agencies, the property owner <br /> and the occupant of the roe if an shall be notified of the intended work prior to its <br /> P property n3' ( Y)� <br /> initiation. Permission and permits to perform the work shall be obtained as necessary. <br /> Advisement shall include notifying these parties of our intent to perform the field work with <br /> this site H&SP in place. <br /> USA will be contacted prior to initiating the work, and a private utility finder will be hired to <br /> examine proposed sample locations for buried structures and pipes. Sierra-Pacific will request <br /> Cargill management's assistance in identifying underground utilities. <br /> Areas for stockpiling soil boring cuttings and decontamination water will be selected at the site <br /> prior to the initiation of cleaning operations. Facility management will be advised of the <br /> Cstorage location in advance of the field work. <br /> L ' <br /> C <br /> Sierra-Pacific Groundwater Consultants, Inc. 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.