My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2900 - Site Mitigation Program
>
PR0506101
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 1:46:27 PM
Creation date
4/3/2020 1:40:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506101
PE
2960
FACILITY_ID
FA0007202
FACILITY_NAME
CARGILL MOLASSES
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
PORT RD 8
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Site Health&Safety Plan <br /> Cargill,Inc.,Port Road No.8 <br /> Stockton,California <br /> Sierra-Pacific Project No.95-128.02 <br /> i <br /> J <br /> 4.0 KEY PERSONNEL AND RESPONSIBILITIES <br /> Key personnel on-site will include the following representative(s): l <br /> J <br /> Site Safety Officer (SSO) <br /> Patrick Durham <br /> Sierra-Pacific Groundwater Consultants . . . . . . . . . . . . . . . . (916) 933-1468 <br /> • Project Manager <br /> John Rapp <br /> Sierra-Pacific Groundwater Consultants . . . . . . . . . . . . . . . . (916) 933-1468 1 <br /> J. <br /> • Client Representative <br /> Jack Holm 1 <br /> Cargill, Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (209) 946-0914 J <br /> J <br /> 4.1 Proiect Manager <br /> The Project Manager is responsible for ensuring that his/her designated SSO is implementing <br /> this H&SP, for providing a copy of this plan to subcontractors and other project participants <br /> as needed, and for advising site workers on health and safety matters. <br /> All activities on site must be cleared through the Project Manager. The Project Manager has <br /> responsibility for the following: <br /> • Allocate and administer resources to successfully comply with all technical and <br /> health and safety requirements; <br /> • Authority to suspend or modify work practices if site safety conditions change or <br /> to dismiss subcontractors whose conduct does not meet the requirements <br /> specified in this Plan; <br /> • Verify that all permits, supporting documentation, and clearances are in place; <br /> Sierra-Pacific Groundwater Consultants, Inc. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.