My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2900 - Site Mitigation Program
>
PR0506101
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 1:46:27 PM
Creation date
4/3/2020 1:40:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506101
PE
2960
FACILITY_ID
FA0007202
FACILITY_NAME
CARGILL MOLASSES
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
PORT RD 8
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Health &Safety Plan <br /> Cargill,Inc.,Port Road No.8 <br /> Stockton,California <br /> Sierra-Pacific Project No.95-128.02 <br /> • Provide technical advice during routine operations and emergencies; <br /> • Inform the appropriate site management and safety personnel of the activities to <br /> r be performed each day; <br /> 6•r • Resolve any conflicts that may arise during implementation of this H&SP; <br /> • Handle an Yemer enc response situations that may arise; and <br /> • Conduct pre-job and periodic tail-gate safety meetings. <br /> 4.2 Site Safety Officer <br /> Health and safety activities are important during all phases of any project. The degree of <br /> Limplementation of the activities or services is related to the perceived risk. The SSO shall have <br /> the responsibility to determine health and safety needs for this project and the authority to <br /> Censure that appropriate measures are taken. The SSO shall immediately inform the Project <br /> r Manager of any health and safety conditions which may adversely affect the project. <br /> Under the appropriate circumstances, the SSO is specifically required to take the following <br /> actions: <br /> • Require specific health and safety precautions prior to work site entry by all <br /> project personnel. Ensure that personnel adhere to,requirements of this H&SP. <br /> • Require any project person to obtain immediate medical attention in case of an <br /> injury or illness. <br /> ,; • Deny access to project personnel to the site or any work site in the event that to <br /> r enter such an area would pose an unacceptable risk. <br /> L� • Order the immediate evacuations of project personnel from any work site when <br /> r conditions posing an unacceptable risk arise through the course of work. <br /> Sierra-Pacific,Groundwater Consultants, Inc. 5 <br /> C <br />
The URL can be used to link to this page
Your browser does not support the video tag.