Work Plan <br /> Facility Demolition and Soil Excavation <br /> Stockton,California <br /> Sierra-Pacific Project No.95-128.06 <br /> will involve the complete removal of roof, external and internal walls, windows, doors, framing, <br /> electrical wiring, plumbing, and flooring materials above the concrete slab floor. Power to the facility <br /> will be turned-off, tagged, and locked-out. Water mains should be shut off during this phase of work. <br /> The work area will be posted and cordoned to prevent non-essential persons from entering the <br /> building during demolition. <br /> The contractor will remove, segregate, load, and transport all materials removed during the <br /> demolition work to a permitted salvage or landfill facility. All material from the demolition work, <br /> debris, liquids, drums, and other waste will be removed from the site. The contractor will provide <br /> copies of all daily work logs, backup invoices, and any other documentation related to the conduct <br /> of the work to Cargill. <br /> Dust control measures will be taken to suppress fugitive dust should dust become visible and <br /> persistent. The job supervisor will monitor the work site as work progresses to assure that workers <br /> are not exposed to asbestos, fuels, reagents, and other hazardous materials. <br /> 3.4 Demolition and Removal of Tanks, Pipes, Fittings and Ancillary Equipment <br /> The contractor will demolish and remove ASTs, pipes, fittings, and ancillary equipment in accordance <br /> with instructions from Cargill. Fittings, piping, and tanks that will be salvaged have been painted <br /> bright orange. In addition, the boiler and associated piping will be removed from the cinder block <br /> boiler shed for re-use. <br /> The contractor will obtain and maintain all necessary County and State permits to conduct this phase <br /> of the work. Hot Work and Confined Space Entry permits may be needed during AST demolition. <br /> Should a confined space need to be entered by contractor personnel, all OSHA/Cal-OSHA permitted <br /> confined space entry requirements will be implemented. The contractor will verify that power lines <br /> have been turned-off, locked-out, and tagged appropriately prior to the demolition work. <br /> Sierra-Pacific Groundwater Consultants, Inc. 4 <br /> ..a <br />