My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2900 - Site Mitigation Program
>
PR0506101
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 1:46:27 PM
Creation date
4/3/2020 1:40:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506101
PE
2960
FACILITY_ID
FA0007202
FACILITY_NAME
CARGILL MOLASSES
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
PORT RD 8
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> Soil Sampling Work Plan <br /> Cargill,Port Road No.8, <br /> Ei.. Stockton,California <br /> Sierra-Pacific Project No.95-128.01 <br /> L <br /> L Selected composite and brass tube impact samples will be sent to a California-Certified <br /> Laboratory, Sequoia Analytical, for TKN and nitrates (NO3) analysis to verify and substantiate <br /> the results of the nitrate test strips and other field tests. Complete sampling procedures and <br /> Lanalytical testing parameters are presented in Appendices A and B, respectively. <br /> To avoid cross-contamination of the samples, protective gloves and sampling tools will be <br /> washed in an Alconox solution and rinsed with potable tap water before each new boring. <br /> Between runs, the auger will be cleaned with various tools and a wire brush according to quality <br /> assurance procedures presented in Appendix C. <br /> Soil generated during augering will initially be placed in a labeled Department of <br /> Transportation (DOT) approved 55-gallon drum. The drummed soil will be characterized and <br /> properly managed. Decontamination water will be collected in a separate labeled DOT <br /> approved 55-gallon drum for characterization and proper disposal. <br /> L <br /> 3.3 Task 3 - Analytical Work <br /> Approximately 24 soil samples will be field tested at the site. Twelve soil samples will be sent <br /> to a certified laboratory. Below is a description of the field and confirmation analytical <br /> procedures that will be used at the site. <br /> Field Testing <br /> About 155 ml of soil and 155 ml of distilled water will be mixed in a sealed plastic bag and <br /> allowed to settle out for about five minutes. Soluble nitrates, nitrites, and ammoniacal <br /> compounds will be extracted with the distilled water. A precise and accurate wet chemical <br /> t„ (Hach) test procedure, and nitrate test strips, may be used to measure and cross-check nitrate, <br /> ( . nitrite, and ammonium concentrations. Geologic and procedural information regarding each <br /> L sample will be recorded in field notes. <br /> Sierra-Pacific Groundwater Consultants, Inc. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.