Laserfiche WebLink
1.1 Program Summary <br /> The field activities covered by this SAP include the following tasks: <br /> • Installation of hand auger/direct-push borings for soil sample collection. <br /> • Installation of hollow-stem auger borings for soil sample collection and <br /> monitoring well installation. <br /> • Collection of groundwater samples from newly installed monitoring wells. <br /> The procedures presented below are designed to obtain samples representative of existing <br /> conditions at the site at the time the samples are collected. The procedures and guidelines <br /> outlined in this document will also be used to evaluate qualitative and quantitative data <br /> obtained from the sampling and analytical program. Consistency of sampling, analysis, <br /> analytical data, laboratory QA/QC data review, and reporting procedures are a high <br /> priority. <br /> QA/QC procedures will be conducted in the field and laboratory. Field procedures will <br /> include field documentation, blind code labeling, and collection of quality control <br /> samples including; sample duplicates, sampling equipment rinsate blanks, and transport <br /> blanks. Laboratory QA/QC procedures will include completion of laboratory <br /> performance criteria including; sample holding times, matrix spike/matrix spike duplicate <br /> (MS/MSD) recoveries, surrogate recoveries, laboratory control samples (LCS) and <br /> laboratory method blank results. <br /> Sampling and Analysis Plan-Final 5/18/2012 <br /> 1-2 <br />