My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SITE CHARACTERIZATION WORK PLAN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3015
>
2900 - Site Mitigation Program
>
PR0537136
>
ARCHIVED REPORTS_SITE CHARACTERIZATION WORK PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2020 2:09:41 PM
Creation date
4/8/2020 2:02:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SITE CHARACTERIZATION WORK PLAN
RECORD_ID
PR0537136
PE
2960
FACILITY_ID
FA0021316
FACILITY_NAME
NUSTAR ENERGY, LP
STREET_NUMBER
3015
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
3015 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 FIELD ACTIVITIES <br /> During site characterization the following primary tasks are scheduled to be performed; <br /> (1) hand auger/direct-push borings for the purposes of soil sample collection, (2) <br /> monitoring well installation and development, and (3) collection of groundwater samples <br /> from newly installed monitoring wells. <br /> 2.1 Hand Auger/Direct-Push Borings <br /> Up to 45 hand auger/direct-push borings will be advanced on the property. Thirty (30) <br /> borings will be located in and around the northern and western portions of the former <br /> Time Oil terminal tank farm where documented unleaded gasoline spills occurred in 1981 <br /> and 1983, and the locations of the former ASTs and product piping. Fifteen (15) <br /> additional borings will be advanced in the area of the inactive loading rack area and pump <br /> manifold area. Approximate hand auger/direct-push boring locations are shown on <br /> Figure 3). Soil samples from each boring will be collected at 2.5 and 5 feet bgs, and 0.5 <br /> to 1 feet above the soil/water interface (7.5 to 10 feet bgs) from each boring, and <br /> submitted for laboratory analyses. <br /> Soil samples will also be collected at 0.5 to 1 foot bgs from the twenty-five (25) borings <br /> located in the tank farm area to assess lead in soils related to historical surface coating <br /> maintenance of the former ASTs. A log of each hand auger/direct-push boring will be <br /> prepared in the field by either a California Professional Geologist (P.G.) or a geologist <br /> working under the direct supervision of a California P.G. Boring logs will include the <br /> project name and location, drilling method, sampling method, soil sample depths, and <br /> descriptions of the soils encountered. Subsurface lithology will be described consistent <br /> with American Society for Testing and Materials (ASTM) D2488-84, Standard Practice <br /> for Description and Identification of Soils (Visual-Manual Procedures). A copy of <br /> ETG's standard boring log is presented in Appendix A. <br /> During drilling activities, the hand auger will be decontaminated between each sample <br /> and between borings. Direct-push boring rods and other downhole equipment will be <br /> decontaminated between borings. <br /> Sampling and Analysis Plan-Final 5/18/2012 <br /> 2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.