Laserfiche WebLink
5. Air Pollution Control District: (Cont) <br /> V. All roadways within the facility constructed of crushed <br /> gravel or limestone should be wetted perodcally to pre- <br /> vent fugitive dust from being transported off-site. A <br /> Proven and accepted dust suppressing reagent and the <br /> planned methods for its distribution should be submitted <br /> for review to the APCD prior to system installaticn. <br /> & M ) <br /> W. All facility emission stacks should be designed and con- <br /> structed to incorporate Good Engineering practice (GEP) <br /> as specified by EPA and/or the APCD. (D & M ) <br /> 9. 2. 0225E2 _ 8 _ <br /> 6/12/89 <br />